Laserfiche WebLink
P1tes <br /> tl <br /> Monitoring System Certification JAN L t <br /> UST Monitoring Site Plan ,z <br /> Site Address: 2701 March Ln . , Stockton <br /> 11111 1111111i 11gli 1111; :j: I <br /> . FSO . TITS <br /> Float & Float & , Float & k . <br /> . . 10 . Chain 9 . 6. Chair} . 51 . 2 Chain I 1 ESO. . <br /> Float & . . . <br /> Float & Float & • 0 4 ' ' Chain 3 ) • 1 <br /> 12 • <br /> ' Ch 11 ' • • 8' Chain' 7 . <br /> DSL STP . . STP. Ali Piping are estimated only <br /> 208 . . . . Premium . . STP <br /> MLD 208 . . Regular . . . <br /> TLM Probe : . MLS . . 208 . . . <br /> . . TLM Probe . . . MIA . . <br /> .TLM Probe <br /> O0 <br /> . 0 . <br /> . 4420 4200 420 . . <br /> . 1 . OVERFILL ALARMM� . . . I . <br /> Date map was drawn: 12/31 /2019 <br /> histructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanlo and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels ; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas ; mechanical or electronic line leak <br /> detectors ; and inAank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br /> was prepared. Page 1 of 1 05/00 <br />