Laserfiche WebLink
FARR ASSOCIATES <br /> Page <br /> 7 0 WELL ABANDONMENT AND SITE CLOSURE 11 <br /> 8 0 SUMMARY AND CONCLUSIONS 11 <br /> 90 REFERENCES 12 <br /> TABLES <br /> 1 Historical Groundwater Elevation Measurements <br /> 2) Water Supply Wells in Site Vicinity <br /> 3) Summary of Groundwater Sampling Analytical Results <br /> 4) Estimate of Mass of Contaminants in Soil Removed from Site <br /> 5) Estimate of Mass of Contaminants in Soil Remaining at Site <br /> FIGURES <br /> 1) Site Vicinity Map <br /> 2) Geologic Cross-Section Identification Map <br /> 3) Cross-Section A-A' <br /> 4) Cross-Section B-B' <br /> 5) Groundwater Elevation Contours, September 8, 1998 <br /> 6) Wells in Site Vicinity <br /> 7) Former Tank Locations and Tank Excavations <br /> 8) Groundwater Analytical Results for Detected Compounds, September 8, 1998 <br /> 9) Residual Soil Contamination <br /> 10) Residual Contamination at Tank Excavation No 3 - Cross-Section <br /> 11) Residual Contamination at Tank Excavation No 4 - West-East Cross-Section <br /> 12) Residual Contamination at Tank Excavation No 4 -North-South Cross-Section <br /> APPENDICES <br /> iA Soil Samples Collected During Tank Removal <br /> B Boring and Well Logs <br /> C Laboratory Analytical Results for Soil Samples from Borings <br /> D Field Data Sheets, Chain-of-Custody and Laboratory Analytical Results for September <br /> 1998 Groundwater Sampling <br /> E Soil Gas Sampling Results <br /> F Documentation of Off-site Soil Remediation <br /> G Drummed Waste Disposal <br /> C WyFdes\Annelwpwm1projectslumonlClosureRpl wpd <br />