My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
800
>
2300 - Underground Storage Tank Program
>
PR0231325
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 8:50:24 AM
Creation date
6/1/2020 11:48:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231325
PE
2361
FACILITY_ID
FA0003997
FACILITY_NAME
PLAZA LIQUOR #1
STREET_NUMBER
800
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
01
SITE_LOCATION
800 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it,rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed. 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring ventltransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> UST Monrtonng Site Plan <br /> Sm Address PLAZA LIOOUR NI BOOS CHEROKEE LANE LODI CA 95240 <br /> SSL <br /> a <br /> r <br /> F <br /> x <br /> L _ <br /> r <br /> C'A$ pp', vEftT1 <br /> X STORE <br /> P <br /> 1� L X <br /> KEY <br /> A=xma A&Sensor <br /> F:FILLS <br /> V a VAPOR 3� — <br /> P=PROBE . . . . - . <br /> L-Turbine;Leak Detector <br /> -l-=St7%IP SE_VSOR . . . *PIPING+ <br /> B=Brine Sensor (ARRONA <br /> S=5trurt Sensor Diawmi;of piptnz <br /> C=Floats&C7rains C 2= wal of R=P and <br /> E o E Stop LDC's No <br /> underzrould <br /> crawmg ts a_-c:rate. <br /> . We=101 <br /> speculate blue <br /> priests <br /> Any items wlderground that we not visible to the cert.,A u4 technician area \ <br /> profe:ezonal opinion oal}and are solely for mfc..-tnabonal r arposes. Dran-tng net to - <br /> icale <br /> Date map was drawn 316.20 <br /> Instruction s <br /> If you already have a diagram that shows all required information you may include rather than this page.with your IJoneormg System Cerffcamn On your sae pla- <br /> show the general layout of tanks and pang Clearef identify Io�ston%of the following equ�pment .1 installed monitoring system cdntfeI panels,sensors momrorne tarn+; <br /> annulaf spaces,sumps.dispenser pans,spill containers.or other secondary contarnment areas mechanical or o4ctronrc line leak detectors,and m-tank liolu d leve <br /> probes(if used for leak detechoni. In the sCace provided,n le the date this Site Plan was prepared. <br /> LEGEND <br /> I <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.