Laserfiche WebLink
ADDITIONAL INFORMATION REQUIREMENTS 2 <br /> FOR REPORT OF WASTE DISCHARGE <br /> CITY OF RIPON <br /> 9. A description of all known or anticipated industrial and commercial dischargers whose individual <br /> BOD,total dissolved solids and/or hydraulic loads will be greater than 2% of the plant's total daily <br /> influent loading, including the following: <br /> a. Name; <br /> b. Industry/business type; <br /> c. Nature of waste stream; <br /> d. Average daily flow (gpd and percentage of total plant loading); <br /> e. Peak daily flow; <br /> f. Average daily BOD loading(lb/day and percentage of total plant loading); <br /> g. Peak daily BOD loading; <br /> h. Salinity(e.g., total dissolved solids, electrical conductivity, major ions); <br /> i. Nitrogen(all forms); <br /> J. Nature of seasonal or diurnal variations in influent flow or quality, if any; and <br /> k. Pre-treatment or self-monitoring programs, if any. <br /> 10. A description of the following for the both existing system and each phase of the proposed <br /> expansion: <br /> a. Average dry weather flow; <br /> b. Peak wet weather flow; and <br /> c. Effluent quality at the point of discharge to the disposal system (BOD, total suspended solids, <br /> settleable matter, nitrogenous compounds, electrical conductivity,pH, and total coliform <br /> organisms). <br /> 11. Narrative description of expected solids generation rates and handling/storage procedures: <br /> a. Debris; <br /> b. Grit and screenings; and <br /> c. Biosolids. <br /> 12. Narrative description of proposed solids disposal practices for debris, grit, screenings, and biosolids: <br /> a. Method of disposal; <br /> b. Frequency of disposal; <br /> c. Disposal site/area name(s) and location(s); and <br /> d. For biosolids (if on-site beneficial re-use is proposed): <br /> Land application rates (dry tons per unit area per application, number of applications per <br /> year); <br />