My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008387
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VINE
>
1500
>
2900 - Site Mitigation Program
>
PR0506306
>
ARCHIVED REPORTS_XR0008387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:09:15 PM
Creation date
6/1/2020 12:05:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008387
RECORD_ID
PR0506306
PE
2951
FACILITY_ID
FA0007337
FACILITY_NAME
HI HOPES VENTURE*
STREET_NUMBER
1500
Direction
E
STREET_NAME
VINE
STREET_TYPE
ST
City
LODI
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
1500 E VINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Z1 INC <br /> After the soil remediation plan has been approved by PHSEHD and the Air District, the Air <br /> ' Pollution Control Officer will be notified in writing of the quantity of soil to be aerated, daily <br /> aeration rate, location, nearest residence and project In addition, prior to initiation of <br /> ' remedial operations, PHSEHD will be advised in writing at least seven (7) days in advance <br /> of planned operations or as deemed appropriate by PHSEHD staff <br /> At the conclusion of the remedial operations, the remediation soil pad will be sampled to <br /> ' confirm that all volatile organic compounds have been reduced to concentrations that are <br /> acceptable to PHSEHD and RWQCB staff for final fate and transport The confirmation <br /> ' sampling will be conducted at the rate of one composite sample for every 150 cubic yards <br /> of remediated soil It is anticipated that all remediated soil will remain on the property and <br /> ' will be used to assist in building up the dirt roads presently on the property No remediated <br /> soil will leave the property without prior written permission of PHSEHD and RWQCB staff <br /> TASK 4• REPORT PREPARATION <br /> ' A final report will be prepared and submitted to PHSEHD which will describe the field and <br /> analytical methods used and present the results of field and laboratory analyses The report <br /> will include a site location map, a site plan map, and other pertinent data Where possible, <br /> ' all analytical data will be posted on cross-sections and maps to expedite regulatory agency <br /> review A discussion of the local geology and hydrogeology to include soil lithologies and <br /> ' the formations involved in the assessment, local groundwater quality and impact the site <br /> may have on the identified or potential water resource and other additional geologic or <br /> ' hydrogeologic information that may relate to the investigation The report will be prepared <br /> under the direction of and signed by a California Registered Geologist <br /> The report will discuss the vadose zone hydrocarbon contamination plume and describe it <br /> ' in terms of character and both vertical and horizontal extent Soil sampling data from both <br /> 08220010 005 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.