Laserfiche WebLink
/- CITY OF TRACY <br /> Development&Engineering Services <br /> TRACY 333 Civic Center Plaza Telephone: (209)831-6400 <br /> !16��;f Tracy, California 95376 Fax: (209)831-6439 <br /> j �sg_ 0 63(4 I ENCROACHMENT PERMIT <br /> Permit No.: 6 C ( " Cn-� (0) 4- Date Of Issuance: 8 7 <br /> Permit Valid Up To: /0 W QP-n-4-- IEWI s BY: 5-,4-1- o4 Z 1 <br /> Inspection Deposit: z� &-C--) 1 t'--L (, Permit Fee: Al? Si; I"n Prt Q C C <br /> (Acct.#ENCIN) i�7 4'- (Acct. #ENCPT) r/ <br /> Engineering Fees Performance Bond N0 '$(o 17 <br /> Compaction Fees <br /> (Acct.#ENCIN) <br /> This permit is hereby issued to encroach on theS side <br /> Lv.blera oLeAe a ( Sfd�H a r for the purpose of ,/� <br /> l�a�erN9Dni�oTi�lSiy�/�s � i seg2� �/is7/ar6edSltJ7d��Sns�oo na .6el7er <br /> TOTAL NUMBER OF WORK DAYS REQUESTED- /1S W 41 S <br /> Name of applicant,4-Zai'/ iy/� ,&$ Fri(/iforiNErt7 7,1 L Telephone IVI,�) QS� 7YS-4> <br /> Address:/ J:7-Z/iles 1,,o/e; L'1w,1 7� Z b oo aW4 //,//5 e"q 3'Zx Z„ <br /> Field Superintendent: /'i / /% OI�tS Ce�lll yNumber. C/y/Go 'eo'49-7 <br /> 4 <br /> 3bvN2S 77 <br /> ;ONDITIONS OF PERMIT <br /> 1. The Permittee shall notify Mark Ruiz, Construction Inspection Division, at(209)483-6091, forty-eight(48)hours prior to <br /> start of work pertaining hereto. <br /> 2. The Permittee agrees to perform work under this permit in accordance with the prevailing City Standards, Specifications <br /> and shall comply with all existing codes and policies. <br /> 3. Permittee shall notify Police& Fire Departments before starting construction of any work. <br /> 4. If construction is not started within 90 days from the issue date, this permit will be void unless uiherwise stated in the <br /> special conditions. G e- � c� y� <br /> 5. Tentative starting date ! Zt� /l <br /> 6. Tentative completion date Z Z&I <br /> 7. Contractors must display nam d phone rilimberatwork site-and provide copy of perms[on request. <br /> 8. The cost of emergency work required to restore unsatisfactory construction that becomes a hazard will be charged to the <br /> Permittee. <br /> 9. Replace full concrete sidewalk squares, as required, by sawcutting along score marks. <br /> 10. Compaction tests shall be required on backfilled trenches at the expense of the Permittee, contact Construction <br /> Inspection 209-831-6471. <br /> 11. Traffic control shall be in accordance with the Caltrans Traffic Manual. <br /> 12. Trenching and resurfacing is to comply with Standard Plan No. 501 and 501A. <br /> 13. The time of construction will be limited between the hours of 7:30 A.M. and 4:30 P.M., Monday to Friday. Any request for <br /> work beyond the hours noted herein and any work on the weekends and holidays will require prior approval from the City. <br /> The Permittee shall pay for all additional City inspections beyond the normal working hours. <br /> 14. City inspections shall be performed Monday-Friday between 8:00 A.M. and 5:00 P.M. Any inspection performed beyond <br /> these hours, in accordance with Condition 13 of this permit, will be considered overtime and will be paid by the Permittee <br /> in advance to the Development& Engineering Services Department. <br /> 15. Non-compliance of City Codes, Plans, Specifications and conditions of this permit may result in fines and penalties as <br /> established by the City Council. n <br /> S. Permittee shall comply with the following special conditions: <br /> Page 1 of 2 <br /> act? 2e,, C76sw o63,Q1 ELLE COPY <br />