Laserfiche WebLink
MAY-23-2003 FRI 02_47 PM AC& MICKELSON EKV FAX N0.1 91WP570 P. 02 <br /> _ _ c—d_�► <br /> ACTON Fatality: Cot rwcr �+-fd <br /> MICKELSON • COMPLETION REPORT <br /> ENVIRONMENTAL, INC. Trac , 44 W 2� Address: V-r West- i�WALo <br /> 50 49 Robert J.Mathews Parkway ft200 M <br /> El Dorado Hills.CA95762 _ AMEProjectNo.: /GO/y.o/ <br /> Drillln9 Company; ' D r — _ locatlon(EastMorth). <br /> Drilled By: �(q RfT` #(� �Yr 'Ground Surface Elevation: <br /> Drill.-.Ing Method: - Lagged By: <br /> Completion Date: Checked By: <br /> DETAILS h WELL CONSTRUCTION DETAILS <br /> w <br /> PROTECTIVE CASING — CONDUCTOR CSING <br /> Diameter._ r r Diameter._- •ff` <br /> Material:_-_ite Material:__ <br /> 0.0 GSE Length:— Length: <br /> TAS - RISER CASING jTji LOCKING WATER TIGHT CAP <br /> Diameter: <br /> Material: E vL <br /> Joint Type: <br /> SURFACE SEAL 1 <br /> Material' <br /> ANNULAR SE y 1 <br /> Material: hR4/_ gnjr o'" U'r.r!•^•fir r 'x�.•< <br /> CENTRALIZERS <br /> Type: <br /> Spacing: <br /> TRANSITION SE L <br /> Material: 1 fri3' <br /> Thickness: —_-�_„_—__ <br /> FILTER PACK f <br /> Material: <br /> 37 TFP. <br /> - - 7 -- SCREEN WITH—�� END CAP <br /> J.I Diameter. <br /> _ Slot Size: <br /> _ Material: SdRik <br /> f, <br /> Length: -----�—.------ <br /> BACKFILL <br /> Material: <br /> BORE HOLE i OUTER BORE HOLE <br /> Diameter: Diameter: <br /> Depth: --"--- <br /> _ WATER LEVEL MEASUREMENT <br /> Date: ----_--_____ <br /> Time: <br /> ...-.... . Level: <br /> _— _— L, eaend <br /> TD TPC TwdNcAe Ike Csslep TTP Top dcm«Pack <br /> Toc Top or Rm Como Tos Tw d sacw <br /> 0.5E Ownd Surtace BOS &man of saw <br /> TASTop dAmular Seal 1"BF Topd Baclklo <br /> BCC McmdConducic Coshy TP Trial Depth <br /> TTS Top dTr spm Seal <br />