Laserfiche WebLink
Californiaeegional Water Quality C•trol Board <br /> Central Valley Region <br /> Katherine Hart, Chair ,,,e„. <br /> 11020 Sun Center Drive,#200, Rancho Cordova,California 95670-6114 <br /> Linda S.Adams (916)464-3291 - FAX(916)464-4645 Edmund G.Brown Jr. <br /> Acting Secretary for hhp://www.waterboards.ca.gov/centralvalley Governor <br /> Environmental Protection <br /> RECEIVED <br /> 26 April 2011 APR 2 7 2011 <br /> PERMIENRONT SERACEENTAL 3LTM <br /> Ms. Julie Raming <br /> Georgia Pacific Corporation <br /> 133 Peach Street <br /> Atlanta, GA 30303 <br /> CONDITIONAL NO FURTHER ACTION DETERMINATION, GEORGIA-PACIFIC <br /> CORPORATION, FORMER TRACY CHEMICAL PACKAGING PLANT, 75 W- VALPICO <br /> ROAD, TRACY, SAN JOAQUIN COUNTY <br /> Georgia-Pacific Corporation (Georgia-Pacific) formerly operated chemical packaging plant at <br /> 75W* <br /> 5W. Valpico Road in Tracy (Site). Site activities resulted in chloroform contamination in soil <br /> and groundwater. <br /> As the attached Memo to Antonia Vorster, the Site Cleanup Program Manager indicates, <br /> Georgia-Pacific excavated soil, pumped and treated groundwater, and used an in situ ozone <br /> sparge system to remove the chloroform from the site soil and groundwater. The Regional <br /> Water Board concurs with Georgia-Pacific that the remaining levels of chloroform do not pose <br /> a threat to human health, the environment, or waters of the State. <br /> On 4 January 2011 Regional Water Board staff sent a fact sheet describing the cleanup <br /> actions and notifying interested persons of their opportunity to provide comments on the 14 <br /> May 2009 Report on Additional Investigations in Support of Site Closure. No comments were <br /> received during the 30-day time period. <br /> Georgia-Pacific has satisfactorily completed site investigation and remedial action, <br /> achieved applicable remedial action standards and objectives, and a permanent remedy <br /> has been accomplished at 75 W. Valpico Road in Tracy. Therefore, no further action is <br /> required. This No Further Action Determination is not effective until after Georgia-Pacific <br /> submits the necessary documentation of the destruction of the site monitoring wells, in <br /> accordance with all applicable County and State requirements. Once proof of appropriate <br /> destruction has been received, Water Board staff will send written confirmation of the <br /> effective date of this Determination. By 1 June 2011, please submit a work plan under <br /> which the monitoring wells at the site will be destroyed. <br /> Issuance of a No Further Action Determination does not preclude future action by the <br /> Water Board if subsequent monitoring, testing, or analysis of 75 W. Valpico Road indicates <br /> California Environmental Protection Agency <br /> �aRecycled Paper <br />