Laserfiche WebLink
F. SITE SAFETY WORK PLAN <br /> ' Team Members list names Responsibility <br /> R.L. Hammond Project Manager <br /> ' Site Safety Officer <br /> R.L. Hammond Public Information <br /> ' Field Team Leader <br /> ' PERIMETER ESTABLISHMENT <br /> Ma /Sketch Attached: ■ Yes ❑ No Site Secured: ■ Yes ❑ No <br /> ' Zone(s)of Contamination <br /> Perimeter Identified: ■ Yes ❑ No Identified: ■ Yes ❑ No <br /> INVESTIGATION-DERIVED MATERIAL DISPOSAL <br /> ' Fl. PERSONAL SAFETY <br /> ' Site Entry Procedures: <br /> Read and sign Site Safety and Health Plan located with A.M.E.personnel on location. <br /> ' Personnel Protection: <br /> Level of Protection: ❑ A ❑ B ❑ C ■ D <br /> ' Modifications: <br /> ' 1. All personnel must wear hard hat,safety shoes, safety glasses,and/or face shield. <br /> 2. Neoprene gloves and tyvek/saranax suit should be worn if contact with contaminated water or soil is likely. <br /> t3. Hearing protection must be worn if noise levels prevent normal conversation at a distance of 3 feet. No <br /> smoking,eating,or drinking is allowed on site. <br /> ' 4. No personnel are to enter or approach any excavation area where there is a danger of wall collapse or <br /> confined space entry. <br /> ' S. Respiratory protection is dependent on conditions listed in the next section. <br /> 1 <br /> ' R2001-032 HASP Tracy GP.doc Page 8 of 14 <br /> 1 <br />