My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
75
>
2900 - Site Mitigation Program
>
PR0506509
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:26:14 PM
Creation date
6/1/2020 12:12:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506509
PE
2960
FACILITY_ID
FA0007466
FACILITY_NAME
GEORGIA PACIFIC CORP (FORMER)
STREET_NUMBER
75
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95336
APN
24613007
CURRENT_STATUS
01
SITE_LOCATION
75 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> V1. FINANCIAL RESPONSIBILITY <br /> 1 . Cost estimate for facility closure. <br /> (a) The owner or operator shall have a written estimate of the <br /> cost of closing the facility in accordance with the applicable <br /> closure requirements of this document. The owner or operator <br /> shall keep this estimate, and all subsequent estimates, at the <br /> facility. The estimate shall equal the cost of closure at the <br /> point in the facility' s operating life when the extent and <br /> manner of its operation would make closure the most expensive, <br /> as indicated by its closure plan. <br /> (b) The owner or operator shall prepare a new closure cost estimate <br /> whenever a change in the closure plan affects the cost of <br /> closure. <br /> (c) On each anniversary of the effective date of this document, <br /> the owner or operator shall adjust the latest closure cost <br /> estimate using an inflation factor derived .from the annual <br /> Implicit Price Deflator for Gross National. Product as published <br /> by the U. S. Department of Commerce in its Survey of Current <br /> Business. The inflation factor shall be calculated by dividing <br /> the latest published annual Deflator by the Deflator for the <br /> previous year. The result is the inflation factor. The adjusted <br /> closure cost estimate shall equal the latest closure cost esti- <br /> mate (see Item 1 (b) ) times the inflation factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.