Laserfiche WebLink
Ms. Polly Lowry <br /> December 4, 1996 <br /> Page 2 <br /> each wells has been fully developed, a groundwater sample will be collected and submitted to a <br /> I State certified analytical laboratory for analysis of chloroform following EPA Method 8010. <br /> Information gathered during the investigation, along with results of the laboratory analyses, <br /> will be submitted to the Regional Water Quality Control Board (Board) within 60 days <br /> following completion of the investigation. The report will also re-evaluate the groundwater <br /> contamination and effectiveness of past efforts to remediate the impacted groundwater, and <br /> make recommendations for future action at the site. <br /> GP and Brown and Caldwell propose to initiate the proposed work within 30 days following <br /> your approval of this work plan. Should you have any questions regarding this work plan, or <br /> the procedures proposed herein, please do not hesitate to call me at (510) 210-2278. <br /> ' Sincerely, <br /> BROWN AND CALDWELL <br /> ' Todd Miller, R.G. <br /> Project Manager <br /> TM: <br /> Attachments <br /> EA2092\pha 114orkplmdoc <br />