My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
75
>
2900 - Site Mitigation Program
>
PR0506509
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:17:28 PM
Creation date
6/1/2020 12:15:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506509
PE
2960
FACILITY_ID
FA0007466
FACILITY_NAME
GEORGIA PACIFIC CORP (FORMER)
STREET_NUMBER
75
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95336
APN
24613007
CURRENT_STATUS
01
SITE_LOCATION
75 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BROWN AND CALDWELL <br /> SITE SAFETY AND HEALTH PLAN <br /> Project Objectives <br /> The California Regional Water Quality Control Board (RWQCB) has requested Georgia- <br /> Pacific to re-evaluate the groundwater contamination/remediation of chloroform at the former <br /> Tracy facility. The RWQCB wants the extent of the groundwater contamination to be defined and <br /> the chloroform contamination remediated. To help define the extent of chloroform groundwater <br /> contamination Brown and Caldwell proposes to install three groundwater monitoring wells. One <br /> of the groundwater monitoring wells will be downgradient of existing wells and the two other wells <br /> will be located near the source area(Figure A). <br /> Field Activities <br /> Brown and Caldwell personnel will oversee the drilling, sampling, and installation of three <br /> groundwater monitoring wells using a drill rig. On-site personnel will include Joseph LaPlante of <br /> Brown and Caldwell, and a two-person crew from Gregg Drilling and Testing, Inc. <br /> KEY PERSONNEL AND RESPONSIBILITIES <br /> Todd Miller is the project manager(PM). Dean Wall is the health and safety officer(HSO). <br /> Pam Murcell is the certified industrial hygienist(CIH). Joseph LaPlante is the project geologist and <br /> will function as the site safety officer (SSO). The project field staff have completed 40 hours of <br /> comprehensive health and safety training which meets the requirements of Title 29 Code of Federal <br /> Regulations Part 1910.120 (29 CFR 1910.120). The SSO has the authority to monitor and correct <br /> health and safety problems as noticed on site. <br /> PM Responsibilities <br /> The PM is responsible for generating, organizing, and compiling the Site Safety and Health <br /> Plan (SSHP) which describes all planned field activities and potential hazards that may be <br /> encountered at the site. The PM is also responsible for assuring that adequate training and site <br /> safety briefing(s) are provided to the project field team. The PM has provided a copy of this SSHP <br /> to each member of the project field team and one copy to each subcontractor prior to field activities. <br /> HSO Responsibilities <br /> The HSO is responsible for developing and coordinating the Brown and Caldwell (BC) <br /> health and safety program. For specific projects, the HSO is responsible for reviewing and <br /> approving the SSHP for accuracy and incorporating new information or guidelines which aid the <br /> PM and SSO in further definition and control of the potential health and safety hazards associated <br /> with the project. <br /> 1 <br /> 0131/9TE:\ MOS\209 UOK-1J\SSH -GPCDOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.