Laserfiche WebLink
INFORMATION SHEET <br /> MUSCO FAMILY OLIVE COMPANY AND THE STUDLEY COMPANY <br /> WASTEWATER TREATMENT FACILITY <br /> SAN JOAQUIN COUNTY <br /> The Discharger is required to submit an Operation and Maintenance Plan to ensure that all persons <br /> responsible for irrigation and monitoring are aware of their responsibilities and are appropriately trained. <br /> This is required because a single reference document that includes the WDRs, instructions for operation, <br /> odor minimization procedures, and other information must be available to operators of the system in a <br /> timely manner. Because the Discharger will be storing odor control chemicals on site that are expected to <br /> be used infrequently, it is important for operators to be able to refer to the O&M Plan for use instructions. <br /> The Discharger is required to submit a Groundwater Well and Lysimeter Installation Report to document <br /> the installation of the wells and lysimeters. <br /> The Discharger is required to submit a Background Groundwater Quality and Percolate Quality Report. <br /> This report is required to allow determination of the effect of wastewater application on the groundwater <br /> quality. If a groundwater quality degradation is observed, upon request of the Executive Officer the <br /> Discharger will be required to submit a Groundwater Mitigation Plan. <br /> Surface water drainage from the facility is to the Sacramento San Joaquin Delta. <br /> TRO: 7/16/2002 <br />