• -4- <br /> ADMINISTRATIVE CIVIL LIABILITY ORDER NO. <br /> MUSCO OLIVE PRODUCTS AND THE STUDLEY COMPANY <br /> SAN JOAQUIN COUNTY <br /> C. Develop and implement a hydrogeologic investigation workplan designed to assess soil and <br /> groundwater conditions beneath the discharge areas; <br /> d. Develop and implement a workplan to study the effects of the discharge on soil and crops at <br /> the discharge areas; <br /> e. Develop a plan for facility improvements designed to ensure adequate long-term wastewater <br /> storage and disposal; and <br /> f. Submit a report verifying that the facility improvements plan has been fully implemented. <br /> 17. The Discharger has submitted most of the technical reports described in Finding No. 16. Some of <br /> the reports were submitted after the dates specified in the C&A Order or were incomplete, as <br /> summarized below: <br /> No. of Days <br /> Report Title Date Due Date Submitted of Violation <br /> Winter Contingency Report 19 December 2000 19 December 2000 0 <br /> Storm Water/Surface Water Sampling Plan 19 December 2000 19 December 2000 0 <br /> Hydrogeologic Investigation Workplan 3 January 2001 3 January 2001 0 <br /> Soil Salinity Study Workplan 3 January 2001 3 January 2001 0 <br /> Hydrogeologic Investigation Report 8 April 2001 ' 14 June 2001 67 <br /> Wastewater Application(Crop Impact)Report 8 April 2001 ' 11 April 2001 3 <br /> Wastewater Facilities Improvements Plan 30 May 2001 Incomplete 240 z <br /> Wastewater Facilities Improvements <br /> Construction Report 15 November 2001 Not Submitted 71 <br /> Total Daily Violations (to 25 January 2002): 381 <br /> 1 The C&A Order required submittal of the report within 90 days of workplan approval. The workplan was <br /> conditionally approved on 8 January 2001. <br /> 2 Each day that the report is incomplete is a violation equivalent to nonsubmittal of the report. <br /> 18. Since adoption of the C&A Order, the Discharger has not completely complied with the <br /> Monitoring and Reporting Program (MRP)No. 97-037. All required monitoring reports were <br /> submitted on schedule, but the reports showed that the Discharger failed to perform all of the <br /> sampling and analysis required by the MRP. These violations of MRP No. 97-037 are <br /> summarized below4 + <br /> No. of Days <br /> Monitoring Report Date Due Date Submitted Completeness of Violation t <br /> 4`h Quarter 2000 Report 30 January 2001 23 January 2001 Incomplete 360 <br /> 2000 Annual Report 31 January 2001 19 January 2001 Incomplete 359 <br /> ls` Quarter 2001 Report 30 April 2001 20 April 2001 Incomplete 270 <br /> 2"d Quarter 2001 Report 30 July 2001 17 July 2001 Incomplete 179 <br /> 3`d Quarter 2001 Report 30 October 2001 15 October 2001 Incomplete 87 <br /> Total Daily Violations (to 25 January 2002); 1,255 <br /> 1 Each day that the report is incomplete is a violation equivalent to nonsubmittal of the report. <br />