REVISED CWC SECTION 13308 TIME SCHEDULE ORDER NO.R5-2002-0014• - 10- <br /> MUSCO OLIVE PRODUCTS AND THE STUDLEY COMPANY <br /> SAN JOAQ UIN COUNTY <br /> 6. Effective 1 February 2002, the Discharger shall prevent any wastewater, or any stormwater <br /> which comes in contact with wastewater or tailwater, from leaving the boundaries of its property. <br /> The penalty shall be $5,000 for each day of violation and$1 per gallon discharged off-site. <br /> 7. By 25 February 2002, the Discharger shall submit a Groundwater Monitoring Workplan that is <br /> consistent with the first section of Attachment A titled"Items to be Included in a Monitoring Well <br /> Installation Workplan and a Monitoring Well Installation Report of Results." Groundwater <br /> monitoring shall be performed upgradient and downgradient of all areas where wastewater storage <br /> or application occurs. Every monitoring well shall be constructed to yield representative samples <br /> from the uppermost aquifer and to comply with applicable well standards. The penalty shall be <br /> $2,500 for each day in which this report is late or incomplete. <br /> 8. By 25 March 2002, the Discharger shall submit a report evaluating the current domestic <br /> wastewater disposal system. In particular, the report shall evaluate the design size of the system <br /> relative to the current number of employees, evaluate any impacts of applying industrial <br /> wastewater to land overlying the leach lines, and evaluate whether there is the potential for <br /> groundwater impacts from the continuing discharge of domestic waste to this system. If there is <br /> the potential.for impacts, then the report shall contain recommendations and a proposed time <br /> schedule for upgrading the system forthwith. The penalty shall be $2,500 for each day in which <br /> this report is late or incomplete. <br /> 9. By I May 2002, the Discharger shall submit a report showing that it has begun construction of the <br /> 114 million gallon storage pond and tailwater system. The report shall show that the pond will <br /> contain a liner designed to prevent the stored wastewater from impacting the underlying <br /> groundwater. The penalty shall be $2,500 per day after 1 May 2002 in which pond construction <br /> has not begun. <br /> 10. By 1 May 2002, the Discharger shall submit a Groundwater Monitoring Well Installation Report <br /> of Results. The report shall be consistent with the second section of Attachment A. The penalty <br /> shall be$2,500 for each day in which this report is late or incomplete. <br /> 11. By 15 May 2002, the Discharger shall submit a report showing that it has planted crops on all land <br /> used for wastewater disposal (i.e., 200 acres less the land used for the storage pond). The report <br /> shall also show that all crops planted prior to January 2002 are actively growing. The penalty <br /> shall be $2,500 per day for each day after 15 May 2002 in which the land is not fully cropped. <br /> $ <br /> 12. Effective 7 June 2002, the Discharger shall limit wastewater application for dust control and <br /> construction purposes to active impoundment construction areas only. The penalty for applying <br /> wastewater to dirt roads as dust control out of the active impoundment construction area shall be <br /> $5,000 for each day after 7 June 2002 in which such a discharge occurs. <br /> 13. By 28 June 2002, the Discharger shall submit a report describing the additional steps it has taken <br /> to minimize offensive odors due to the land application of wastewater. The penalty shall be <br /> $5,000 for each day in which this report is late or incomplete. <br />