Laserfiche WebLink
ADMINISTRATIVE CIVIL LIABILIMCOMPLAINT NO.R5-2002-0502 <br /> MUSCO OLIVE PRODUCTS AND THE STUDLEY COMPANY -4- <br /> 0 SAN JOAQUIN COUNTY <br /> f. Submit a report verifying that the facility improvements plan has been fully implemented. <br /> 16. The Discharger has submitted most of the technical reports described in Finding No. 15. Some of <br /> the reports were submitted after the dates specified in the C&A Order or were incomplete, as <br /> summarized below: <br /> No. of Days <br /> Report Title Date Due Date Submitted of Violation <br /> Winter Contingency Report 19 December 2000 19 December 2000 0 <br /> Storm Water/Surface Water Sampling Plan 19 December 2000 19 December 2000 0 <br /> Hydrogeologic Investigation Workplan 3 January 2001 3 January 2001 0 <br /> Soil Salinity Study Workplan 3 January 2001 3 January 2001 0 <br /> Hydrogeologic Investigation Report 8 April 2001 ' 14 June 2001 67 <br /> Wastewater Application(Crop Impact)Report 8 April 2001 ' 11 April 2001 3 <br /> Wastewater Facilities Improvements Plan 30 May 2001 Incomplete 2402 <br /> Wastewater Facilities Improvements 15 November 2001 Not Submitted 71 <br /> Total Daily Violations 381 <br /> ' The C&A Order required submittal of the report within 90 days of workplan approval. The workplan was <br /> conditionally approved on 8 January 2001. <br /> z Each day that the report is incomplete is a violation equivalent to nonsubmittal of the report. <br /> 17. On 30 November 2001, the Executive Officer issued Revised Monitoring and Reporting Program <br /> (MRP)No. 97-037. Since adoption of the C&A Order, the Discharger has not completely <br /> complied with the previous MRP. All required monitoring reports were submitted on schedule, <br /> but the reports showed that the Discharger failed to perform all of the sampling and analysis <br /> required by the MRP. These violations of Order No. 97-037 are summarized below. <br /> No. of Days <br /> Monitoring Report Date Due Date Submitted _Completeness of Violation ' <br /> 4`h Quarter 2000 Report 30 January 2001 23 January 2001 Incomplete 360 <br /> 2000 Annual Report 31 January 2001 19 January 2001 Incomplete 359 <br /> 151 Quarter 2001 Report 30 April 2001 20 April 2001 Incomplete 270 <br /> 2"d Quarter 2001 Report 30 July 2001 17 July 2001 Incomplete 179 <br /> 3`d Quarter 2001 Report 30 October 2001 15 October 2001 Incomplete 87 <br /> Total Daily Violations 1,255 <br /> ' Each day that the report is incomplete is a violation equivalent to nonsubmittal of the report. <br />