My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Musco Family Olive Company - 2 - 23 September 2013 <br /> Meeting Summary <br /> On 19 September 2013, staff received Musco's proposed activity schedule. These dates are <br /> reprinted below, as are additional reports to be submitted. <br /> SUMMARY OF TASKS AND REQUIRED REPORTS <br /> TASK Date <br /> Phase I: Begin Geotechnical Investigation 26 September 2013 <br /> Submit Well Installation Work Plan* 30 October 2013 <br /> Property Purchase Complete 20 November 2013 <br /> Contract Final Design 20 November 2013 <br /> Submit Report of Waste Discharge 15 December 2013 <br /> Construction Bid Process Begin 15 January 2014 <br /> Completion of Monitoring Well Installation* 30 January 2014 <br /> Begin New Monitoring Well Sample Collection* 15 February 2014 <br /> Submit Well Installation Report* 15 March 2014 <br /> CEQA Complete and Obtain All Agency Permits 15 April 2014 <br /> Begin Construction of Class II surface 1 June 2014 <br /> im oundments <br /> Submit 1s Semi-Annual Monitoring Report* 31 July 2014 <br /> Approval of New WDRs 7 August 2014 <br /> Update Financial Assurances** 30 August 2014 <br /> Complete Construction of New Class II surface 30 August 2014 <br /> impoundments <br /> Submit Letter Report Describing the 15 September 2014 <br /> Termination of Discharge of Waste Water in <br /> Pond A and Startup of Discharge in New <br /> Ponds** <br /> Submit Construction Quality Assurance Report 15 October 2014 <br /> with Documentation — Final Construction <br /> Report" Include Geotechnical Investigation) <br /> Submit Pond A Closure Work Plan and 30 October 2014 <br /> Schedule** <br /> Submit Water Quality Protection Standard 1 January 2015 <br /> Report" <br /> *Water Board staff inserted required task. **Reports to be included in new WDRs. <br /> Staff appreciates the effort Musco is putting forth to comply with Title 27 and the WDRs. The <br /> schedule submitted provides a framework for the work to be completed. Staff has added <br /> additional reports that will be required to document new well construction, document the <br /> construction of the new surface impoundments, and update financial assurances. Several of <br /> the reports will likely be included as a schedule in the new Waste Discharge Requirements <br /> (WDRs). <br /> As shown in the schedule above, by 30 October 2013 Musco shall submit a well installation <br /> work plan for the construction of three groundwater monitoring wells that will be associated with <br /> the DMP for the new Class II surface impoundments. The work plan shall follow the Monitoring <br /> Well Installation Workplans and Monitoring Well Installation Report guidelines attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.