CWC SECTION 13308 TIME SCI•ULE ORDER NO.R5-2002-0014 10- <br /> MUSCO OLIVE PRODUCTS AND THE STUDLEY COMPANY <br /> SAN JOAQUIN COUNTY <br /> 8. By 1 May 2002, the Discharger shall submit a report showing that it has begun construction of the <br /> 114 million gallon storage pond and tailwater system. The report shall show that the pond will <br /> contain a liner designed to prevent the stored wastewater from impacting the underlying <br /> groundwater. The penalty shall be $2,500 per day after 1 May 2002 in which pond construction <br /> has not begun. <br /> 9. By 1 May 2002, the Discharger shall submit a Groundwater Monitoring Well Installation Report <br /> of Results. The report shall be consistent with the second section of Attachment A. The penalty <br /> shall be $2,500 for each day in which this report is late or incomplete. <br /> 10. By 15 May 2002, the Discharger shall submit a report showing that it has planted crops on all land <br /> used for wastewater disposal (i.e., 200 acres less the land used for the storage pond). The report <br /> shall also show that all crops planted prior to January 2002 are actively growing. The penalty <br /> shall be $2,500 per day for each day after 15 May 2002 in which the land is not fully cropped. <br /> 11. By 15 July 2002, the Discharger shall submit a report showing that the pond and tailwater system <br /> have been fully constructed and are operational. The report shall also describe the pond <br /> construction details and show that a liner, adequate to prevent the stored wastewater from <br /> impacting the groundwater, has been installed. The penalty shall be $2,500 for each day after <br /> 15 July 2002 in which the pond and/or tailwater system are not operational. <br /> 12. Effective 7 September 2002, the Discharger shall be continuous compliance with the daily flow <br /> limit of 500,000 gpd discharged to land (as described in WDRs No. 97-037). The 500,000 gpd <br /> shall be the sum of daily applied wastewater and any tailwater that has been collected and <br /> reapplied to the land. Each day of violation after 7 September 2002 shall result in a penalty of <br /> $2,500 per day of violation. <br /> 13. Effective 7 September 2002, the Discharger shall be in continuous compliance with the BOD and <br /> DIS daily maximum loading limits contained in Discharge Specification B.6 of WDRs No. <br /> 97-037. For each constituent, each day of violation after 7 September 2002 shall result in a <br /> penalty of$2,500 per day of violation. <br /> 14. All technical reports required herein that involve planning, investigation, evaluation, or design, or <br /> other work requiring interpretation and proper application of engineering or geologic sciences, <br /> shall be prepared by or under the direction of persons registered to practice in California pursuant <br /> to California Business and Professions Code sections 6735, 7835, and 7835.1. To demonstrate <br /> compliance with sections 415 and 3065 of Title 16, CCR, all technical reports must contain a <br /> statement of the qualifications of the responsible registered professional(s). As required by these <br /> laws, completed technical reports must bear the signature(s) and seal(s) of the registered <br /> professional(s) in a manner such that all work can be clearly attributed to the professional <br /> responsible for the work. <br />