My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:44:39 PM
Creation date
6/1/2020 12:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
893
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT ORDER NO. 5-00-717 • - 6 - <br /> MUSCO OLIVE PRODUCTS AND THE STUDLEY CORPORATION <br /> MUSCO OLIVES PRODUCTS,TRACY FACILITY <br /> SAN JOAQUIN COUNTY <br /> C. Collection of soil samples for geotechnical analysis from plastic (fat) clay which are <br /> interpreted to comprise aquitard material in the pond borings. The hydraulic <br /> conductivity of each sample shall be determined in an "undisturbed" condition (not <br /> remolded) using a flexible wall permeameter using ASTM 5084-90. The samples <br /> shall also be tested for grain size distribution using ASTM D-422. A minimum of two <br /> samples per boring shall be analyzed. <br /> 3. Within 90 days after approval of the hydrogeologic investigation workplan, the Discharger <br /> shall submit a hydrogeologic report of results, containing the data described in C.2 (above), <br /> scaled figures, and an interpretation of the data collected. <br /> 4. By 3 January 2001, the Discharger shall submit a workplan to further investigate the effect <br /> of wastewater application on soil quality and the fate of the dissolved solids that are applied <br /> to land. At a minimum, the work shall include: <br /> a. A summary of the dissolved solids that are applied to the land application areas and an <br /> evaluation of the fate of the dissolved solids (i.e. adsorbed to site soil, leached to <br /> greater depth, or redissolved and transported off site in surface water). <br /> b. A summary presentation of all the soil quality data collected to date. The presentation <br /> shall include description of the depth, location, and analytical results. <br /> C. A statistical evaluation of the soil quality data to evaluate trends in the data generated. <br /> d. Additional sampling of soil, and composting of samples,to better evaluate the soil <br /> quality. Soil parameters that shall be included are: <br /> i. pH <br /> ii. Cation Exchange Capacity <br /> iii. Percent Base Saturation <br /> iv. Exchangeable Sodium Percentage <br /> v. Soil Salinity <br /> 5. Within 90 days after approval of the wastewater application workplan, the Discharger shall <br /> submit a report on the wastewater application on soil quality. The report shall contain the <br /> data described in CA (above), scaled figures, and an interpretation of the data. <br /> 6. By 31 January 2001, the Discharger shall submit a technical report on the effect of the <br /> application of the wastewater on crops. The report shall evaluate the present health of the <br /> crops grown in the application area, the effect of continued application of wastewater at <br /> present and increased flows, and the potential for increased soil salinity and the resulting <br /> impacts to future agricultural use. The report shall be prepared by a Certified Agronomist or <br /> other person specializing in soil/plant/water relationships. <br /> D. Design and Construction of Long Term Storage and Disposal Facilities <br /> 1. By 30 May 2001, the Discharger shall submit a technical report on the long term storage <br /> and disposal facility improvements. The report shall include the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.