Laserfiche WebLink
Mr. Benjamin Hall - 3 - • 25 September 2000 <br /> Installation Workplan and a Monitoring Well Installation Report of Results. The following items will <br /> need to be addressed: <br /> • For the well placement at the 1 Mgal storage pond, the two downgradient wells must be located <br /> within 30 feet of the toe of the pond berm. The upgradient well should be located upgradient of the <br /> pond berm to allow collection of groundwater samples upgradient of the storage pond. <br /> • The workplan describes soil sampling but does not specify the sampling interval. The goal of the <br /> groundwater monitoring program is to monitor the first saturated zone. Samples shall be collected <br /> for lithologic description at minimum five-foot intervals. It is noted that the sampling hammer <br /> should be dropped 30 inches for a standard penetration test (ASTM D1586-99). <br /> • Well development shall be performed no sooner than 24-hours after the well grout (cement/bentonite <br /> slurry)has been installed in accordance with the Department of Water Resources California Well <br /> Standards, Bulletin 74-90. This is considered especially important to protect the surface seal of the <br /> wells. <br /> • Permits from the San Joaquin County Environmental Health Department must be obtained prior to . <br /> installation of groundwater monitoring wells. <br /> • If conditions in the borehole allow, it is recommended that the sand pack be surged prior to installing <br /> the bentonite seal. <br /> • The following comments on the well construction methods are provided: <br /> — If site specific conditions allow, well screen length should be 20 feet long to allow for variation <br /> in the depth to groundwater. If a slip cap is used on the bottom of the well casing, it must be <br /> secured using stainless steel screws. <br /> — The workplan states a six-inch diameter auger will be used to drill the soil boring (nine inch in <br /> Table 3) and a six-inch well casing will be installed in the boring. Department of Water <br /> Resources California Well Standards, Bulletin 74-90 requires a minimum two-inch thick gravel <br /> pack. In addition, the well casing could not be installed in the specified hollow stem auger. <br /> — Musco should ensure the driller is aware of the possibility of well casing damage caused by well <br /> grout heat of hydration. <br /> If you have any questions, or want to schedule a meeting to discuss these issues or the cleanup and <br /> abatement order being developed,please telephone me at (916) 255-3116. <br /> J� <br /> TIMOTHY R.O'BRIEN <br /> Waste Discharge to Land Unit <br /> San Joaquin River Watershed <br /> cc: Mr. Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Richard Stratton, HDR, Folsom <br /> CWmj _Filalt(l MusD 010915WR lilac <br />