Laserfiche WebLink
MUSCO OLIVE PRODUCTS INSPECTION • 8 and 10 NL4Y 2000 <br /> View to the south of tailwater detention pond (Pond No. 3). Pump at right is a manually operated <br /> diesel powered pump which sends wastewater to the 50-acre future application area sprinklers. <br /> View to the south of Pond No 3. Heavy vegetation downstream of the pond shows leakage <br /> through the embankment is occurring. <br />