Laserfiche WebLink
Kennedy/Jenks Consultants <br /> Section 8: Anticipated Schedule <br /> Following receipt of approval from the RWQCB, the additional data evaluation activities <br /> proposed in this Work Plan will be initiated. Musco would like to install the monitoring wells and <br /> lysimeters proposed herein no later than 15 November 2010. <br /> If this Work Plan is approved in a timely manner, and installation of the additional monitoring <br /> wells and lysimeters is completed by 15 November 2010, it is anticipated that WQPS for <br /> groundwater will be submitted to the RWQCB by 15 February 2012. The evaluation and <br /> servicing of the existing lysimeters will be completed by 30 November 2010 and the second <br /> semi-annual lysimeter sampling will be conducted on fully serviced/evaluated lysimeters. <br /> A technical report describing installation of the monitoring wells and lysimeters will be submitted <br /> to the RWQCB approximately 60 days following completion of the field activities. <br /> Work Plan for Improved Detection Monitoring Program Page 21 <br /> Musco Family Olive Company, Tracy, California <br /> g! empnWminpbON20104Wm�wWeW reWd ViW_27 dmpWf dmumamlreport text-09-26.doc <br />