My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Appendix D: Standard Operating Guideline <br /> Well Construction and Development <br /> D.1 Introduction <br /> This guideline describes procedures used by Kennedy/Jenks Consultants (Kennedy/Jenks) <br /> personnel for well construction and development following completion of boring and soil sampling <br /> procedures (described in Standard Operating Guideline, Boring and Subsurface Soil Sampling). <br /> D.2 Well Construction Materials <br /> 2-inch Schedule 40 PVC blank casing <br /> • 2-inch Schedule 40 PVC slotted casing, of appropriate slot size <br /> • 2-inch Schedule 40 PVC threaded and slip caps <br /> Hasp-locking standpipes <br /> • Ground-level traffic-rated watertight well housing enclosure <br /> Locking expansion plugs <br /> • Combination or key lock <br /> Filter pack sand <br /> Type I or 11 Portland cement <br /> • Concrete <br /> • Bentonite powder <br /> • Bentonite pellets or chips <br /> D.3 Well Development Equipment <br /> 2-inch-diameter vented surge block <br /> • Submersible pump (2-inch-diameter wells or larger) <br /> • 55-gallon DOT-approved drums <br /> • Steel or PVC bailer <br /> DA Typical Procedure <br /> 1. Following completion of selected borings, install the monitoring well casing through the center of <br /> the hollow stem auger, drive casing, or open boring. The monitoring well consists of a PVC <br /> Schedule 40 slotted well casing of appropriate diameter and a blank casing with a threaded <br /> bottom cap and a slip or threaded top cap or watertight expansion plug. The casing string must <br /> be held in tension during initial installation. If installed in drive casing, place centralizers at the <br /> top and bottom of the well screen, and every 30 feet from the top of screen to the ground <br /> surface. <br /> 2. Place clean, well-graded sand around the slotted section of the monitoring well to serve as the <br /> filter pack. The grade of sand is chosen on the basis of aquifer units encountered. The filter <br /> pack is emplaced as the auger or temporary casing is removed from the boring. <br /> Work Plan for Improved Detection Monitoring Program Appendix D <br /> Musco Family Olive Company, Tracy, California Page D-1 <br /> y;v:yi.m„mY�iazwzofoaoolnscma.eio�+aaisume zi ery�ve�mmsienndxe.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.