My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' B-2.7 Decontamination of Equipment <br /> ' To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> ' trisodium phosphate or non-phosphate detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> B-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. Closure is <br /> accomplished by grouting the boring with a cement based grout material or as otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the boring <br /> and left on site for disposal by the site owner. If requested, Kleinfelder can coordinate disposal <br /> ' of soil and water after analytical results are available. <br /> ' B-3 GROUNDWATER WELL INSTALLATION <br /> B-3.1 Monitoring Well Construction <br /> ' Construction details for shallow groundwater monitoring wells are as follows: <br /> ' . The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule 40 PVC <br /> ' pipe. <br /> The wells are constructed in 6- or 8-inch diameter borings. <br /> ' • Well screen sections are perforated with 0.010- or 0.020-inch factory-cut slots. <br /> ' The wells are generally screened from 5 feet above to 15 feet below first groundwater. <br /> The screen length is reduced if an aquitard with a minimum thickness of 5 feet is <br /> ' encountered. If an apparent aquitard is encountered, the well is usually terminated 1 to 2 <br /> feet into the aquitard. Effort is made not to screen across two aquifers. If confined <br /> aquifer conditions or high vadose zone contamination are encountered; the well screen is <br /> usually not set above the depth of first encountered groundwater. Wells are usually not <br /> set in areas of suspected significant soil contamination. <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> ' 12406/2002R160 Page B-4 <br /> Copyright 2002,Kleinfelder,Inc. February 20,2002 <br /> KLEINFELDER 2825 East Myrtle Street,Stockton, CA 95205-4794 (209)948-1345 (209)948-0621 fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.