My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
2900 - Site Mitigation Program
>
PR0516772
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:35:35 PM
Creation date
6/1/2020 12:29:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516772
PE
2965
FACILITY_ID
FA0012793
FACILITY_NAME
MUSCO OLIVE LAND APP/TITLE 27
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
01
SITE_LOCATION
17950 W VIA NICOLO RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- - - <br /> KLEINFELDER <br /> C-8 TANK REMOVAL SAMPLING <br /> ' C-8.1 Collection of Soil Samples and Laboratory Analysis <br /> Soil and water samples will be collected during the tank removal operations in accordance with <br /> ' the current Leaking Underground Fuel Tank Field (LUFT) Manual and the Tri-Regional <br /> Guidelines issued by the California Regional Water Quality Control Board(RWQCB). <br /> A Kleinfelder, environmental geologist will be on site during the tank removal activities to <br /> collect soil samples for qualitative field screening and laboratory analysis. Tank excavation soil <br /> samples will be obtained by scraping the sidewalls or excavation bottom at the desired locations <br /> with the backhoe bucket. Samples will then be collected from the bucket by packing soil in a <br /> ' clean brass tube with a clean hand trowel. The soil samples may also be collected using a slide <br /> hammer lined with a clean brass tube with appropriate extension to reach the desired sampling <br /> depth. The collected brass tubes will then be sealed with Teflon sheets and tight fitting plastic <br /> caps. <br /> ' C-8.2 Collection of Water Samples and Laboratory Analvsis <br /> If water is encountered in the excavation after the tank is removed, a representative sample will <br /> be collected for laboratory analysis. The tank excavation may be purged and allowed to refill <br /> ' before sampling. The water sample will be collected using a clean disposable bailer with new <br /> nylon cord. The bailer will be retrieved and the water will be contained in appropriate bottles <br /> ' supplied by the analytical laboratory for the requested analysis. <br /> In accordance with the Tri-Regional Guidelines one water sample will be collected from the tank <br /> ' excavation. The water sample will be delivered under chain-of-custody procedures to a state <br /> certified laboratory. <br /> endB <br /> t <br /> ' 20-2594-03.004/2011R447 Page C-9 <br /> June 8,2001 <br /> Copyright 2001,Kleinfelder,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.