My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
75
>
3500 - Local Oversight Program
>
PR0545783
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:52:03 PM
Creation date
6/1/2020 12:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545783
PE
3529
FACILITY_ID
FA0003882
FACILITY_NAME
C D MATTHES TRUCKING 28
STREET_NUMBER
75
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24613007/8
CURRENT_STATUS
02
SITE_LOCATION
75 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B) ILL EXCAVATION CERTIFICATE <br /> Project Location LJ 4/2tr / cif CA <br /> Owner STEGt/ Phone NoAeg) &..W--z4rx <br /> Contractor c-,'o, Phone N . 4'loG—S License No. 3& 8 <br /> L <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> L1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12 lifts: „ <br /> A. Pea gravel--smooth, rounded material not more than one-half(112) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (314) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made.between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> r <br /> DECLARATION. <br /> "hereby certify that,a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br /> he 3 <br /> erification that tselect material described above will be placed at a minimum of five (5) cubic yards per 1000 gall'o' n tank <br /> �splacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> Name (Print) <br /> u e (Print) <br /> ignature <br /> "' Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.