My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
75
>
3500 - Local Oversight Program
>
PR0545783
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 12:52:03 PM
Creation date
6/1/2020 12:47:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545783
PE
3529
FACILITY_ID
FA0003882
FACILITY_NAME
C D MATTHES TRUCKING 28
STREET_NUMBER
75
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24613007/8
CURRENT_STATUS
02
SITE_LOCATION
75 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page 5 <br /> Imw <br /> Perscannel <br /> All sul�cc:nt'.r{-�c:t�ir pr�r••sr�+�nE�7. who are. likely t� be exposed to <br /> by inhalation or dermal contact <br /> hzrds mahGtRcls either ours Of off-site health and safety <br /> shall zacompleted h <br /> training , in accordance with the Ci�,l-lfs+ interim and final <br /> Hanar•-c:ieac..Rs Waste and Emergency Qe:-ration5 rule. Subcontractor- <br /> l.,,r sonnel who are requ-ired to work on the site for short <br /> peperiod, of time (1-day or less) , and who will not be required <br /> W <br /> to wear protective equipment , shall have completed a <br /> least 24 !-yours of off--sit��� health and safety training. <br /> j-+ All N Amnon! <br /> prior to starting off the project , a kick:-off safety will be <br /> on the site. During this meeting all personnel will be <br /> briefed an the reqs-tirce[i7e--nts contained within the health and <br /> safety ety pl yin , and will be told the site safety rules. The <br /> kick--off safety meeting will be conducted jointly by the <br /> project manager and they HSO. <br /> At the beginning of each work shift , or whenever new <br /> personnel arrive on the site, a tailgate safety meeting will <br /> be held. The Purpose of such meetings, is to highlight health <br /> amd safety concerns and to ensure that employees are fully <br /> ' hr-iuved on the site work procedures to be +allowed during <br /> tttr} sh;:i f t.. The tailgate safety meetings will be conducted by <br /> the first line super'•vi sors. The project manager will review <br /> records of all tailgate safety meetings. <br /> L MEDICAL SURVEILLANCE <br /> All subcontractor- personnel shall provide proof of having <br /> �..� successfully completed a preplacement or annual update <br /> physical examination. This examination shall have been <br /> ' <br /> designed to comply with regulatory requirements for <br /> �. <br /> hazardous waste operations and ::hall include the following: <br /> medi.cal and occ::upati.onal, histcry form <br /> physical examination <br /> blood analysis <br /> 1" urinalysis <br /> chest -.ray. <br /> ' <br /> pulmonary function 'test <br /> 46w audiogram <br /> l esc'i:_rowardi.ogram ( if indicated during the physical <br /> ' exam) <br /> alcohol and illegal drum screening <br />
The URL can be used to link to this page
Your browser does not support the video tag.