Laserfiche WebLink
, <br /> Page 9 <br /> TOOL AND 'EQUIPMENT HANDLING (29 CFR 1926. 301) <br /> SAFETY DEVICES- Employees must never remove, displace, rd <br /> UPSAFETY <br /> destroy, or carry away any safety device, sa+egua , <br /> . notice '' or warning used at the Company facilitie«a, Company <br /> job locations <br /> property, or customer . <br /> �~ <br /> N in any way, interfere with the use of another <br /> ever ' ' Verify that all guards <br /> ' o�mpl�yee's safety device or safeguard. <br /> and other protective devices are in their proper place, i n <br /> lowand <br /> repair , and properly adjusted for safe operation. Any <br /> ' deficiency or malfunction must be reported immediately to the <br /> supervis/or or Safety Representative. <br /> ' DAMAGED/UNSAFE EQUIPMENT- REPAIR WORK <br /> i operating e <br /> ^~ Employees must not repair o�e equipment or machinery, <br /> oi t or machinery is <br /> i1 moving parts, except when the equ pmen <br /> ` <br /> designed or fitted with safeguards to protect the employee <br /> while perforaiing the work. <br /> ^ Equipment that is worn , damaged , or otherwise defective to <br /> the extent that it is unsafe must be reported immediately to <br /> a� the supervisor or Safety Representative. <br /> ` <br /> CRANE/HOISTING EQUIPMENT <br /> , <br /> Unauthorized persons are not to be permitted in a crane cab <br /> ` n a crane at any time. All unattended equipment shall be <br /> or <br /> an <br /> against operation b\/ unauthorized persons, signals to <br /> o~ gu <br /> the operator of the equipment shall be given by a designated <br /> ' person. <br /> Cranes derricks, hoists or other equipment shall not be used <br /> ' s <br /> for side pulls or lift that would affect the stability or <br /> ` overstress the equipment. <br /> m� shall be loaded so that the load is in a <br /> Hoisting equipment <br /> stable position and does not exceed the designated safe load~ <br /> Loads shall be test lifted , brakes checked , and slings <br /> *~ readjusted when required , to check the stability and safety <br /> ` of the lift. <br /> u� Outriggers, when provided , shall be used for the stability <br /> and safe operation of the equipment. The operator shall <br /> personally check that the outriggers have been properly <br /> L~ placed and blocked in position. <br /> ' A mobile or overhead traveling crane, hoist , or shovel shall <br /> not be operated unless the gong or other effective warning . <br /> device is in suitable operating condition. Equipment surfaces <br /> �� <br />