Laserfiche WebLink
Therefore, it is recommended that the north half of the stockpile <br /> be segregated and both half piles be resampled. one sample, (a <br /> composite from various locations in each pile) should be col- <br /> lected from both halves and analyzed for Total Petroleum <br /> Hydrocarbons as diesel. Disposition of the soil will be depen- <br /> dant upon the analytical results of the composite samples. <br /> 10 <br />