My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012644
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
100
>
3500 - Local Oversight Program
>
PR0545784
>
ARCHIVED REPORTS_XR0012644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 1:08:20 PM
Creation date
6/1/2020 12:54:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012644
RECORD_ID
PR0545784
PE
3528
FACILITY_ID
FA0005413
FACILITY_NAME
LAURA SCUDDERS
STREET_NUMBER
100
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24802015
CURRENT_STATUS
02
SITE_LOCATION
100 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
est y. <br /> k <br /> [:Y <br /> A � <br /> August 17, 19Q7 Ii 1 E» <br /> ' CNVIROMENTAL HEALTH <br /> I ERMIT/SERVICES <br /> GENERAL <br /> ENGiNEERING <br /> CONTRACTORS <br /> & S E R V I C E San Joaquin Local <br /> Health District <br /> MAINTENANCE <br /> ,.., 1601 E. Hazel ton Avenue <br /> LiCEN'SE NO.467293 Stockton, CA 95205 <br /> Attention: Doug Wilson <br /> Dear Doug, <br /> As per our phone conversation, this letter is an update of <br /> work completed on the underground fuel system at Laura Scudder's, <br /> 100 W. valpico Road, Tracy, California. In addition, we would <br /> like to submit G plan to upgrade the fuel system, making it more <br /> manageable so as to conform with the Title 23 requirements. <br /> r yJ' Ilackeround: <br /> Ther twouel tanks and associated piping at Laura Scudder's <br /> were originally tested by Accutite Co. from S. San Francisco. <br /> Both systems failed precision tests. At that time, Precision <br /> " Industries was contacted. After an inspection of the facility <br /> and the discovery of many fuel supply lines it was evident that <br /> the tanks needed to be uncovered, with tank only tests to be <br /> performed. With all lines disconnected. both tanks passed <br /> precision tests. At that point, we began to air test individual <br /> product lines. <br /> Seven of the ten lines air tested failed to hold any pressure <br /> and on further inspection we found a high degree of corrosion on <br /> many product lines. Since the lines that would not hold pressure <br /> have not been active in seven years, very little hydrocarbons <br /> were observed in the soil in the specific areas excavated. <br /> Pro osal: Industries, Inc. <br /> - Laura Scudder's has requested that Precision Indu <br /> submit a proposal for the renovation of their fuel system. The <br /> renovation can be split into three distinct parts. <br /> 1) Removal of one 10,000 gallon tank. Laura Scudder's feels <br /> that lessened fuel requirements and the increased age of tank 11 <br /> Snake it a candidate for removal. o til low for soil test- <br /> --- -- - -- ----- --- -2)_Remo-vat "-e -`—ng-Pro u--- <br /> -- <br /> 9911 3G0l332 54fl4 <br /> 2191 NAVY DR,5107.KION.CALEFORNIA952Go 2091462 <br />
The URL can be used to link to this page
Your browser does not support the video tag.