My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012644
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
100
>
3500 - Local Oversight Program
>
PR0545784
>
ARCHIVED REPORTS_XR0012644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 1:08:20 PM
Creation date
6/1/2020 12:54:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012644
RECORD_ID
PR0545784
PE
3528
FACILITY_ID
FA0005413
FACILITY_NAME
LAURA SCUDDERS
STREET_NUMBER
100
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24802015
CURRENT_STATUS
02
SITE_LOCATION
100 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W& ` <br /> ISM <br /> ea — <br /> August 17, 1987 <br /> ENVIROMENTAL HEALTH <br /> G. E N E R A L I ERMIT/SERVICES <br /> ENGINEERING <br /> CONTRACTORS <br /> A SE T A TT RVIC <br /> San Joaquin Local <br /> MAINTENANCE10N N Health District <br /> LICENSE NO. Afi7293 1601 E. Hazelton Avenue <br /> Stockton, CA 95205 <br /> Attention: Doug Wilson <br /> Dear Doug, <br /> _. As per our phone conversation, this letter is an update of <br /> work completed on the underground fuel system at Laura Scudder's. <br /> 100 W. Valpico Road, Tracy, California, In addition, we would <br /> like to submit a plan to upgrade the fuel system, making it more_ <br /> manageable so as to conform with the Title 23 requirements. <br /> Background: <br /> The two Fuel tanks and associated piping at Laura Scudder's <br /> were originally tested by Accutite Co. from S. San Francisco. <br /> Both systems failed precision tests. At that time, Precision <br /> w Industries was contacted. After an inspection of the facility <br /> and the discovery of many fuel supply lines it was evident that <br /> the tanks needed to be uncovered, with tank only tests to be <br /> M performed. With all lines disconnected, both tanks passed <br /> precision tests. At that point, we began to air test individual <br /> product lines. <br /> Seven of the ten lines air tested failed to hold any pressure <br /> and on further inspection we found a high degree of corrosion on <br /> many product lines. Since the lines that would not hold pressure <br /> have not been active in seven years, very little hydrocarbons <br /> - were observed in the soil in the specific areas excavated. <br /> Proposal : <br /> Laura Scudder's has requested that Precision Industries, Inc. <br /> submit a proposal for the renovation of their fuel system. The <br /> renovation can be split into three distinct parts. <br /> 1) Removal of one 10,000 gallon tank. Laura Scudder's feels <br /> that lessened fuel requirements and the increased age of tank #1 <br /> make it a candidate for removal. <br /> 2) Remova --egg pro u o allow for soil test- <br /> 2191 NAVY DR..SF0CKT0N,CAL1F0QNiA95-Xb <br /> est- <br /> 2191NAVYDR..SF0CKT0N,CALiFORNiA95-Xb 2091462.9911 .300/332.5900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.