My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 7:41:10 AM
Creation date
6/1/2020 1:55:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 5 of 6) <br /> XVII. FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown Fiber lass A D B 0 I C 0 D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> Z Engineered Method (Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages2 <br /> Fill Riser Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 6/10/2023 <br /> UST Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XVIII. COMMENTS <br /> Provide any additional comments here. <br /> XIX. VENT/TRANSITION SUMP TESTING INFORMATION <br /> Manufacturer Identify Vent/Transition Sump ID from Section III for each Manufacturer <br /> a ❑ I b ❑ I c ❑ I d ❑ <br /> a ❑ I b ❑ I c ❑ I d ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Vent/Transition Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> XX. COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III-No Vent/Transition Sump present at this UST Facility. <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.