Laserfiche WebLink
t <br />' 23 July 1998 , <br /> AGE-NC Project No 95-0143 <br />' Page 4 of 4 <br />' the approved remediation system should be initiated once a bid has been accepted <br /> • Continued quarterly monitoring of the monitoring well system on the site The next quarterly <br />' monitoring will be scheduled for August 1998, concurrent with monitoring at the Madison <br /> site <br />' 6.0. LIMITATIONS <br /> 1 Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> 1 upon analytical results provided by an independent laboratory Evaluations of the geologic <br /> conditions at the site have been made from a limited number of available data points (i a ground <br /> water monitoring well samples and ground water measurements), and subsurface conditions may <br /> vary through time and with distance from these data points No other warranty, expressed or implied, <br /> is made as to the professional recommendations contained in this report <br /> li <br /> I <br /> I <br /> 1 + <br /> i <br /> I , <br /> Advanced GcoEnvironmcntil,Inc <br /> I , <br />