Laserfiche WebLink
lie 14 November 2002 <br /> AGE-NC Project No 95-0143 <br />' Page 4 of 4 <br /> • Continued quarterly monitoring of the ground water monitoring well system on the site The <br /> next quarterly monitoring should be performed in December 2002, concurrent with <br /> monitoring at the Madison site <br /> IUpon pre-approval of costs, completing the scope of work proposed in the AGE-prepared <br /> Revised Remedial Action Work Plan,dated 09 August 2002,and approved by the EHD in the <br /> letter dated 19 August 2002, for installation of 18 ozone sparge points and operation of an <br /> ozone sparge system <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the ground water <br /> Iconditions at the site have been made from a limited number of available data points(I a monitoring <br /> wells and ground water samples), and subsurface conditions may vary through time and with <br /> distance from these data points No other warranty, expressed or Implied, is made as to the <br /> 10 professional interpretations, opinions and recommendations contained In this report <br /> 0 <br /> IAdvanced GeoEnvaronmental,Inc <br />