Laserfiche WebLink
i <br /> I24 April 2003 <br /> • AGE-NC Project No 95-0143 <br /> Page 4 of 4 <br /> • Continued quarterly monitoring of the ground water monitoring well system on the site <br /> concurrent with monitoring at the Madison site <br /> • Initiahon of the ozone sparge system <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in flus or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the ground water <br /> I conditions at the site have been made from a limited number of available data points(I a monitoring <br /> wells and ground water samples), and subsurface conditions may vary through time and with <br /> distance from these data points No other warranty, expressed or implied, is made as to the <br /> Iprofessional interpretations, opinions and recommendations contained In this report <br /> I <br /> I <br /> Advanced GeoEnvironmentxl,Ine- <br /> I <br />