Laserfiche WebLink
RECENPri <br /> UNDERGROUND STORAGE TANK IIG 1 l ?p?� <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 6 of 6V <br /> IG <br /> UNDER-DISPENSER CONTAINMENT TESTING INFQRMATION <br /> Manufacturer(s) Identify UDC ID from Section III for each Manufacturer "rl_., <br /> Western Fiberglass 1 X 2 3 ❑x 4 x❑ 7r >, ; 1'.;, 6El <br /> 7 ❑ 8 ❑ 1 9 ❑ 1 10 ❑ 11 ❑ 1 12 ❑ <br /> 1 ❑ 2 ❑ 1 3 ❑ 1 4 ❑ 1 5 ❑ 1 6 ❑ <br /> 7 ❑ 8 ❑ 1 9 ❑ 1 10 ❑ Ill ❑ 12 ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify) <br /> ❑ Industry Code or Engineering Standard (Specify). <br /> ❑x Engineered Method(Specify) Caldwell Systems/Hydrostatic 30 minutes <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages2 <br /> UDC Testing Training and Certifications(List applicable certifications) Expiration Date <br /> Caldwell Level Change Indicator 7/5/2020 <br /> ICC Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XXII. COMMENTS <br /> Provide any additional comments here. <br /> If the facility has more components than this form accommodates,additional copies of these pages may be attached. <br /> UDC=Under-Dispenser Containment:ID=Identification <br />