Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: 11/27/2019 <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annularspaces or vault;4)devices monitoring product piping;5)devices monitoring fllpiping;6)devices monitoring ventpiping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> fdonitoring system Certification <br /> UST Monitoring Site Plan <br /> +PIPLL\G} <br /> Site Addnsa: LODI FOOD 3 LIQUOR 1225 W.LOCKEFORD STREET LODI CA 95240 (ARROWS)"--------"--' Drswiae of <br /> p3piae out of <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . sump and LDC s. <br /> 0 0 0, Jl <br /> k _ No tinder-otmd <br /> O drawing - <br /> ==atc w4 <br /> . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . cannot speculate <br /> . . . . . . . . . . . . . . . . + O blue prints. <br /> o . . <br /> 0 <br /> 0 <br /> C STORE <br /> 0 E7 <br /> r zi <br /> 0 <br /> . . zL . . . . <br /> I:.F, . . . . . <br /> . . . . . . . . . . _ . . A=ANNULAR <br /> F=FILLS <br /> T=TURBINE <br /> Z FI— <br /> P=PROB£ <br /> V_[_•1POR <br /> L=SLT1IP SENSOR <br /> tectorL=Leak Detector <br /> ------ M=3 fantvar <br /> • - - - - <br /> B=Brine Sensor <br /> I=Smart Sensor <br /> S=STP <br /> C=Floats ar Chaim <br /> E=E Stop <br /> -trlr:term ara3ar�ourrri ris ma no:r�ib7a:o rhe ren�(tnnp rschri:imr ora a <br /> prgfacsionc7 opimor orf!•;mut me foie:,.for infarmmionalpmposet. ar=cing <br /> no:rosrula <br /> Date map was drawn: 11122117 <br /> Instructions <br /> If you alms=y have a diagram that shows a required information you may include:t.rather than this page,with your Monitoring System Certification On your site plan, <br /> showti.-gsneral layout of tanks and piping. Clearty Identify locatccs of the following equipment,ifinstalled monitoring system control panels:sensors monitoring tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other se_crdary containment areasmechanical or elecoonc line leak detectors;and in-task liquid leve! <br /> probes(if used for leak detectonj. In the scats prov:ced,acre tt,e date this Site Plan was prepared. <br /> LEGEND <br />