Laserfiche WebLink
SJCAPCD <br /> MITIGATION MEASURES <br /> Page 2 <br /> 3 ) Use of petroleum-based dust palliative shall meet <br /> the road oil recruirements of the District ' s Rule <br /> 409 . 5 , Cutback Asphalt Paving Materials . <br /> 4) Streets adjacent to the project site should be <br /> swept as needed to remove silt which may have <br /> accumulated from construction activities . <br /> D. At all times , ozone precursor emissions should be <br /> controlled by the following methods : <br /> 1) All internal combustion engine driven equipment <br /> should be properly maintained and well tuned <br /> according to manufacturer ' s specifications . <br /> 2 ) During the smog season (May through October) , the <br /> construction period should be lengthened so as zc <br /> mininnize the number of vehicles and e-_,_, _ nen.. <br /> operating at the same time. <br /> s <br /> i <br />