My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 11:22:35 AM
Creation date
6/2/2020 1:33:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of s) <br /> VIII . ` MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? © ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, 0 ❑ ❑ <br /> functional) tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with © ❑ ❑ <br /> their proper operation ? <br /> Was monitoring system set-up reviewed to ensure proper settings ? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested, and confirmed operational? W1 ❑ El <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? V1 ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically © El ❑ <br /> disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? W1 El <br /> Which sensors initiate positive shut down? (Check all that apply.) © Sump © Under-Dispenser Containment 1:1 <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g . , modem) operational? 0 El ❑ <br /> For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Replaced TLS Battery for Pm Purpose. <br /> Disp 7/8 has outer cable showing inner cable . Tried to replace sensor but it is epoxied in place . Sensor is functioning . <br /> X. IN -TANK GAUGING TESTING <br /> Check this box if tank gauging is used only for inventory control . (Do not complete this section) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be com leted if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ❑ ❑ El <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally ❑ ❑ ❑ <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ I ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ 1 ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ❑ I ❑ ❑ <br /> For any answer of "N" above, describe in Section X/ how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> j Y = Yes, N = No, NA = Not Applicable <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.