Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) <br /> Type of Action ❑ Installation Test ❑Repair Test ❑x 12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10181397 2/3/2020 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> E.F. KLUDT OIL - KERO <br /> Business Site Address City ZIP Code <br /> 1126 E PINE ST I LODI, CA 95240 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification.) Phone# <br /> DAVID WINKLER (209) 744-0112 <br /> Contractor!Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 08-1739 Ex.3/31/20 8883059-UT 1/29/2020 <br /> Spill Container Testing Training and Certifications(List applicable certifications.) <br /> Franklin Fueling - EBW& Phil Tite #10009853708 Ex. 11/29/20 <br /> OPW#104-633 Ex. 3/14/2020 <br /> III. SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used: ❑x Manufacturer Guidelines(Specify): WATER TEST <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product,etc.) KERO 110 <br /> Spill Container Manufacturer: EBW OPW <br /> Method of Cathodic Protection: ❑x Non-Metallic ❑x Non-Metallic ❑Non-Metallic ❑Non-Metallic <br /> ❑Isolation ❑Isolation ❑Isolation ❑Isolation <br /> ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V.) <br /> Inside Diameter of Spill Container:(Inches) 12 11 <br /> Depth of Spill Container: (Inches) 11 1/2 141/4 <br /> Does the spill container have a 5 gallon capacity? ❑x Yes ❑No 0 Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve ❑x Drain Valve ❑Drain Valve ❑Drain Valve <br /> ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump <br /> ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V.) ❑Other(Specify in V) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results: ❑x Pass ❑Fail ❑x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ail <br /> V. COMMENTS <br /> Any items marked"Fail"above must be explained in this section. Any additional comments may also be provided here.''.' <br /> �EH 13 2020 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations, Title 23, Division 3, <br /> Chapter 16,Section 2637.1 and all the information contained herein is accurate. <br /> UST Service Technician Signature � 1 <br /> If the facility has more components thanVihis form accommodates,additional copies of this page may be attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground Storage Tank,ICC=International Code Council <br />