Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> r. COMMUNITY DEVELOPMENT DEPARTMENT <br /> Q. <br /> • 1810 E.HAZELTON AVE..STOCKTON,CA 95205-6232 <br /> 0 <br /> 4�lFoa�'`P PHONE:209/468-3121 Fax:209/4683163 <br /> October 30, 1995 <br /> M_E_M_O_R_A_N_D_U_M <br /> i <br /> TO: Lisa F. Brown, Deputy District Attorney <br /> FROM: Thomas M. Gau, Senior Civil Engineer % + <br /> Development Services/Engineering Divisie/n ` <br /> SUBJECT: REVIEW OF SITE PLAN FOR CHRISTY BROTHERS ' EQUIPMENT SALES <br /> FACILITY (SA-92-27) <br /> (18626 N. STATE ROUTE 99, WEST FRONTAGE ROAD, ACAMPO; <br /> APN: 013-220-36) <br /> ----------------------------------------------------------------- <br /> The above-referenced Site Plan was submitted on October 2 and has <br /> been reviewed with the Department of Public Works, Public Health <br /> Services, and Jerry Herzick of this Department' s Building <br /> Inspection Division. Based upon that review, the following <br /> deficiencies were identified: <br /> DEPARTMENT OF PUBLIC WORKS: The Site Plan should provide more <br /> detail regarding the on-site spillway, as well as of the off-site <br /> improvements (paving and grading details) to indicate how water <br /> will be conveyed from the site to the sump south of the project <br /> site. <br /> PUBLIC HEALTH SERVICES: The Site Plan should be revised to 1) show <br /> barricades for the septic system, 2) accurately reflect the "as- <br /> built" septic system, and 3) state the number of employees the <br /> system was designed to serve. <br /> DEVELOPMENT SERVICES DIVISION: <br /> It is not clear from my review of the Site Plan whether nine or the <br /> ten required automobile parking spaces have been provided on the <br /> site. <br /> The required sign and lighting details have not been included on <br /> the Site Plan. <br /> The Site Plan does not include the required details of the proposed <br /> portable screening devices for the contractor' s storage area. <br /> The Site Plan did not indicate that the required landscaping, <br /> comprised of boxed trees at 25 feet on center, would be provided <br /> along the length of the site' s frontage on State Route 99 . <br /> The curb along the fence line needs to be extended to channel the <br /> storm drainage runoff to the spillway required by Public Works. <br />