Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> • 1810 E.HAZELTON AVE.,STOCKTON.CA 95205-6232 <br /> c4�iFOAiNP PHONE:2091468.3121 Fax:2091468-3163 <br /> November 1, 1995 <br /> Dave Christy <br /> Woodbridge Auto & Equipment Sales and Rental <br /> P.O. Box 121 <br /> Woodbridge, CA 95258 <br /> Dear Mr. Christy: <br /> RE: REVIEW OF REVISED SITE PLAN FOR SA-92-27 <br /> (APN: 013-220-36, 18626 N. STATE ROUTE 99, WEST FRONTAGE <br /> ROAD, ACAMPO) <br /> The above-referenced Site Plan, submitted to this Department on <br /> October 2 , 1995, has been reviewed with the Department of Public <br /> Works, Public Health Services, and the Building Inspection <br /> Division. Based upon that review, the following deficiencies were <br /> identified: <br /> DEPARTMENT OF PUBLIC WORKS: The Site Plan should provide more <br /> detail regarding the on-site spillway, as well as of the off-site <br /> improvements (paving and grading details) to indicate how water <br /> will be conveyed from the site to the sump south of the project <br /> site. <br /> PUBLIC HEALTH SERVICES: The Site Plan should be revised to 1) show <br /> barricades for the septic system, 2) accurately reflect the "as- <br /> built" septic system, and 3) state the number of employees the <br /> system was designed to serve. <br /> DEVELOPMENT SERVICES DIVISION: <br /> It is not clear from the review of the Site Plan whether nine or <br /> the ten required automobile parking spaces have been provided on <br /> the site. <br /> The required sign and lighting details have not been included on <br /> the Site Plan. <br /> The Site Plan does not include the required details of the proposed <br /> portable screening devices for the contractor's storage area. <br /> The Site Plan did not indicate that the required landscaping, <br /> comprised of boxed trees at 25 feet on center, would be provided <br /> along the length of the site's frontage on State Route 99. <br /> The curb along the fence line needs to be extended to channel the <br /> storm drainage runoff to the spillway required by Public Works. <br />