My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004158
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
15322
>
2600 - Land Use Program
>
GX-92-03
>
SU0004158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:42 PM
Creation date
6/2/2020 2:46:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004158
FACILITY_NAME
GX-92-03
STREET_NUMBER
15322
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
15322 E HWY 120
RECEIVED_DATE
4/9/1992 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
141706 <br /> 37 . NO FILLS SHALL BE ALLOWED THAT WOULD IMPAIR POWER POLE GROUND- a r <br /> NOTES TO-CONDUCTOR CLEARANCES. Q m <br /> 1 . THE ASSESSORS PARCEL NUMBERS FOR THIS SITE IS: 245-040-28 . 38 . ANY NIGHT LIGHTING ESTABLISHED ON THE PROPERTY SHALL BE ARRANGED > <br /> AND CONTROLLED TO NOT ILLUMINATE PUBLIC RIGHTS-OF-WAY OR ADJACENT � <br /> 2 . THIS PROJECT SITE CONTAINS 20 . 1 ACRES ± . PROPERTIES . <br /> 3 . THE AVERAGE EXISTING ELEVATION OF THE PROJECT SITE IS 64 . 9 . 39 . BENCH MARK: C & G. S. BRASS DISC NORTH EAST CORNER OF STATE <br /> 4 . THE AVERAGE SURROUNDING ELEVATION OF THE PROJECT SITE IS 63 . 9 . HIGHWAY 120 AND NORTH RIPON ROAD, F-958 ELEVATION = 62 . 42 . <br /> 40 . OWNER SHALL NOTIFY THE AIR POLLUTION CONTROL DISTRICT IN WRITING o <br /> 5 . THE AVERAGE FINISHED GRADE ELEVATION OF THE PROJECT SITE IS 63 . 9 . WITH ]RESPECT TO THE ACTUAL DATE OF GRADING/ EXCAVATION ONE WEEK <br /> 6 . THIS PROPOSED GRADING EXCAVATION PROPOSES TO REMOVE APPROXIMATELY PRIOR TO SAID ACTIVITIES . THE OWNER SHOULD USE FILE NO. GX w <br /> IN THE COMMUNICATION TO THE DISTRICT AND UNDER THE ATTENTION OF cc <br /> 24 , 592 CUBIC YARDS OF MATERIAL. THE PLANNING SECTION IF AND WHEN GRADING AND/OR EXCAVATION IS <br /> 7 . EXISTING GROUND WATER IS BELOW ELEVATION f:Tf 1 VAS{ =� PC t,, *A5at4 IMPLEMENTED. <br /> iIff�60n1� 41 . ALL CONDITIONS OF APPROVAL OF THE GRADING PERMIT APPLICATION <br /> 8 . NO STRUCTURES ARE TO BE REMOVED AS A PART OF THIS PROJECT. SHALL BE MADE A PART OF THIS GRADING EXCAVATION PLAN. <br /> 9 . w <br /> THE EXCAVATION SITE IS NOT SUBJECT TO A 100 YEAR FLOOD. 42 , IF NOXIOUS WEEDS ARE DISCOVERED, THE CONTRACTOR SHALL ERADICATE a <br /> THEM IN ACCORDANCE WITH INSTRUCTIONS FROM THE AGRICULTURAL, ° <br /> 10 . A PERFORMANCE BOND OR OTHER FINANCIAL SECURITY SUFFICIENT TO COMMISSIONER OF SAN JOAQUIN COUNTY. <br /> COVER THE COST OF REHABILITATION OF THE SITE FOR AGRICULTURAL USE <br /> SHALL BE SECURED BY THE OWNER OR CONTRACTOR, AND APPROVED BY <br /> COUNTY COUNSEL, PRIOR TO THE COMMENCEMENT OF ANY EXCAVATION. <br /> 11 . THE OWNER AND CONTRACTOR SHALL CONFORM TO ALL GENERAL AND SPECIkL <br /> CONDITIONS OF APPROVAL SET BY THE SAN JOAQUIN COUNTY PLANNING <br /> DEPARTMENT AND DEPARTMENT OF PUBLIC WORKS . <br /> Z <br /> 12 . THE OWNER AND CONTRACTOR SHALL CONFORM TO ALL SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH STANDARD EXCAVATION CONDITIONS . <br /> 13 . THE CONTRACTOR SHALL MAINTAIN A WATER TRUCK ON THE PROJECT SITE 0 <br /> 7 0 <br /> TO PROVIDE DUST CONTROL AS NECESSARY . L LL <br /> 14 . SOUTH SAN JOAQUIN IRRIGATION DISTRICT SHALL BE NOTIFIED AT LEAST o J <br /> 48 HOURS IN ADVANCE OF THE COMMENCEMENT OF ANY EXCAVATION WORK. <br /> 15 . THE S . S .J . I . D. FACILITIES SHOWN HEREON ARE PLOTTED FROM AVAILABLE <br /> RECORDS AND SURFACE LOCATION TO SHOW GENERAL LOCATION ONLY . THF' ` <br /> CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE ACTUAL Q r <br /> LOCATION OF ALL FACILITIES PRIOR TO EXCAVATION. Uj <br /> 16 . THE LAND OWNER AND EXCAVATION CONTRACTOR AGREE NOT TO PERFORM ANY U Z <br /> EXCAVATION OR GRADING WITHIN THE S . S .J . I .D . EASEMENT OR WITHIN 15 ^ O O <br /> FEET OF THE CENTERLINE OF THE PIPELINE , WHICHEVER IS GREATER. W L o <br /> 17 . EXCAVATIONS ADJACENT TO A DISTRICT PIPELINE AND/OR CANAL SHALL r 1 <br /> HAVE A MINIMUM 3 : 1 SLOPE FROM EXCAVATED FIELD TO TOP OF BERM. 7 V7 <br /> 18 . THE LAND OWNER/EXCAVATION CONTRACTOR WILL TAKE SUCH STEPS AS L <br /> REQUIRED BY THE S . S .J . I . D. WATER SUPERINTENDENT TO REMEDY EROSION C <br /> ON BANKS ADJACENT TO THE DISTRICT ' S FACILITIES . D <br /> 19 . NO SOIL WILL BE STOCK PILED OVER THE S . S .J. I .D. PIPELINE . OWNER <br /> 06 cy <br /> T M <br /> 20 . NO HEAVY A & j BOERSMA EQUIPMENT WILL TRAVEL OVER THE S . S .J . I .D. PIPELINE 7i� '� (LL�. <br /> Q _ _ _ _ _ 15326 E. HIGHWAY 120 y Oct O <br /> AND/OR CANAL WITHOUT APPROVED BRIDGING, SAID BRIDGING TO BE t RIPON, HIGHWAY <br /> APPROVED BETWEEN S . S .J. I . D. AND THE CONTRACTOR. <br /> M5 04, z4 Z <br /> 21 . NO TREES AND/OR RUBBISH WILL BE DISPOSED OF OR STORED ON THE <br /> S . S.J. I .D. EASEMENT OR FACILITIES . L�V~ � DATE Q <br /> 22 . THE LAND OWNER AND EXCAVATION CONTRACTOR AGREE THAT THE EXISTING <br /> PIPELINES DO NOT PRESENTLY LEAK AND AGREE THAT ANY DAMAGE WILL BE <br /> REPAIRED AT THE LAND OWNER' S EXPENSE. <br /> 23 . IT IS UNDERSTOOD BY THE LANDOWNER AND THE EXCAVATION CONTRACTOR <br /> THAT THE S . S .J . I .D. SHALL NOT BE HELD RESPONSIBLE TO REMEDY HIGH Si�Ei'Li� <br /> WATER TABLE PROBLEMS IF THEY OCCUR DUE TO THIS PROPOSED EXCAVATION. application # -�2 3. <br /> 24 . IT IS THE CONTRACTOR' S RESPONSIBILITY TO VERIFY THE LOCATION OFRece'ived By - - <br /> ALL EXISTING UTILITIES . THE UTILITIES SHOWN HEREON ARE PLOTTED <br /> FROM AVAILABLE RECORDS AND SURFACE LOCATION TO SHOW GENERAL <br /> LOCATION ONLY . THE CONTRACTOR SHALL DO NO EXCAVATION UNTIL ALL -oq �-�7 .� *r <br /> UTILITY AGENCIES HAVE BEEN NOTIFIED AND HAVE BEEN GIVEN THE 1■� ��y++ <br /> OPPORTUNITY TO MARK THEIR UNDERGROUND FACILITIES IN THE FIELD. I z <br /> THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONARY MEASURES TO i U <br /> PROTECT ALL UTILITIES . <br /> 25 . THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR ~ �, <br /> JOB SITE CONDITIONS THROUGHOUT THE COURSE OF THE PROJECT, 1 U <br /> INCLUDING SAFETY OF ALL PERSONS AND PROPERTY AND COMPLIANCE WITH I Qy w <br /> ALL HEALTH REQUIREMENTS . THIS CONDITION SHALL APPLY CONTINUALLY Z Q <br /> AND NOT BE LIMITED TO NORMAL WORKING HOURS . THE CONTRACTOR SHALL <br /> INDEMNIFY AND HOLD HARMLESS THE OWNER AND THE SURVEYOR FROM ANY / A r" 00 <br /> AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE Z O <br /> PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY -, 5 <br /> ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR SURVEYOR. Rd• a� <br /> SITE MAP v E,auise Ave. p� Lout i••� , <br /> 26 . THE QUANTITIES SHOWN HEREON ARE APPROXIMATE AND FOR PURPOSES OF v �� Fr Elshoz w � <br /> THIS PERMIT ONLY. THE CONTRACTOR AND/OR OWNER SHALL NOT USE THIS V) a` c Rd. W <br /> GRADING EXCAVATION PERMIT AS A BASIS OF PAYMENT FOR EXCAVATED � � v sc.A�� Deane Rd a Ro h c H <br /> MATERIAL. <br /> ,Q CorncOMK Rd. <br /> cr_ CCo d�A s ATS • <br /> 27 . STOCKPILING WILL NOT BE REQUIRED . A SOILS REPORT IS BEINGLeroya "j <br /> OMNI <br /> PREPARED AND WILL BE AVAILABLE BEFORE THE ISSUANCE OF A PERMIT. ee SC�i00+. Rd. Dona L o0 ""� U <br /> Bl 7 7 ` G Ave. 0 ° o w <br /> Grave Rd. o �' o <br /> 28 . ANY PRIVATE OR DISTRICT IRRIGATION STRUCTURE INSTALLATION OR Q 0 a 0 <br /> MODIFICATION NECESSITATED BY THE PROPOSED EXCAVATION SHALL BE Rd. <br /> PERFORMED AT THE OWNER' S EXPENSE . FURTHER, OWNER SHALL OBTAIN A <br /> o Mello Q Rd <br /> "STRUCTURE APPLICATION AND AGREEMENT" APPROVAL FROM THE �9�r Clinton <br /> DISTRICT ' S BOARD OF DIRECTORS PRIOR TO INSTALLING , MODIFYING OR _ o~ 'j" j, e > South Vl <br /> REMOVING ANY IRRIGATION STRUCTURES ON DISTRICT FACILITIES . CL �� River Rd. <br /> don Rd- p`` �a L antos River Q `� <br /> 29 . NO EXCAVATION IS PERMITTED INTO THE GROUND WATER TABLE WITHOUT a, z Colony Rd_ <br /> SPECIFIC APPROVAL FROM THE REGIONAL WATER QUALITY CONTROL BOARD, rita5 � C_ � > \� 0 <br /> CENTRAL VALLEY REGION. Av ar N I°C© ' Mf lgeo A Ve <br /> � 'a SPRING CHEEK � � � r..� <br /> 30 . THE MATERIALS FROM THIS EXCAVATION SHALL NOT BE DEPOSITED INTO St Q RQipon R OUNTRY ('t-UB <br /> � <br /> ANY WATER COURSE NOR IN ANY WAY CONTRIBUTE TO THE POLLUTION THEREOF. 3 c <br /> 31 . APPLICANT SHALL PROVIDE AN APPROVED POTABLE WATER SUPPLY FOR ALL j v o <br /> EMPLOYEES. <br /> Lyon cr <br /> - <br /> Y Hutchinson ��� Of ��J c <br /> 32 . APPLICANT SHALL PROVIDE APPROVED SANITARY FACILITIES FOR ALL Rd. o L+ccarelji\ 4� c <br /> EMPLOYEES . Q - LL <br /> ure Rd_ ( 2 Kiernan DATE q <br /> 33 . THE APPLICANT SHALL IMPLEMENT THE AIR POLLUTION CONTROL <br /> DISTRICT' S FUGITIVE DUST CONTROL GUIDELINES DURING EXCAVATION. <br /> . Covert m DRAWN BY <br /> cr o R - JA41 <br /> 34 . ALL INTERNAL COMBUSTION ENGINES ON EXCAVATION VEHICLES SHALL BE SURVEYOR' S STATEMENT <br /> PROPERLY TUNED AND MAINTAINED. CHECKED BY <br /> S . S . J . I . D „ ITS EMPLOYEES AND AGENTS ARE NOT RESPONSIBLE FOR I , MICHREL L , QUARTAROLI , HEREBY STATE THAT I AM A LICENSED M�' <br /> 35 . ALL PRIVATE ROADS INVOLVED IN THIS EXCAVATION SHALL BE MAINTAINED VERIFICATION OF TOR ELEVATIONS AND DIMENSIONS INDICATED ON LAND SURVEYOR NO , 4450 OF THE STATE OF CALIFORNIA , AND THAT JOB NO. <br /> SO AsS To CONTROL THE CREATION OF DUST. PLANS NOR ANY ERRORS OR OMISSIONS THAT MAY BE PRESENT , THIS MAP CORRECTLY REPRESLLNTS A TOPOGRAPHIC SURVEY MADE 10 <br /> APPROVAL IS SUBJECT TO THE DATA SHOWN WHICH APPEARS TO BE IN UNDER MY DIRECTION ONI: 1p 611 <br /> 36 . CUTS OR EXCAVATIONS WILL NOT BE ALLOWED WITHIN 10-FEET OF ANY CONFORMITY �41TH S � S , J , I , D , REQUIREMENTS FOR PROTECTION OF VICINITY M A P SHEET <br /> POWER POLE. DISTRICT FACILITIES , <br /> SO CONDITIONALLY APPROVED _- DATE MICHAEL L , QUARTAROLI , L S , 4450 DATE OF :3 SHEETS <br />
The URL can be used to link to this page
Your browser does not support the video tag.