Laserfiche WebLink
APPLICATION- GRADING EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ::: _>:::::::::......<:.:: . >:>:::>::»:::>::::»: 0Q:PING►S AND STRUCTURE3''>: >:> ...... ...<: ':> > : '> : '': <br /> ::: :>::;: io <br /> ::;.;:::::.::::»::>:::..><:: .. ..,;:eliott m be shown ot:Eha <br /> Structure NumberProposed Use " Ground Floor Area Highest Floor Overall Height (in <br /> feet) <br /> d /3E r<LU c-i17E Q IR 10 (• Z <br /> * <br /> The'structure number' should be used in identifying the structure on the Site Plan. <br /> •• If there are two or more proposed uses in a building, make separate listings for each use. For residential buildings, state <br /> the number of units in each structure. <br /> . Domestfc waw . <br /> Public Water Service Provider Annex-Formation Distance to Public <br /> Proposed ❑ Required Water (Feet) <br /> Existing ❑ <br /> Private Water Existing Well New Well ❑ Well Replacement ❑ <br /> Sewso"Disposal <br /> Public Sewage Service Provider Annex-Formation Distance to Public <br /> Disposal Required Sewer Facility <br /> Proposed❑ <br /> Existing❑ <br /> On-site Sewage Existing Septic System New Septic System ❑ Other ❑ <br /> Disposal <br /> Storm Drainage <br /> Public Storm Service Provider (if Public) Annex-Formation Terminal Drainage Detention- <br /> Drainage Required to: Retention Ponds <br /> Proposed❑ <br /> Existing❑ <br /> Private Storm On-site Retention Pond(s) ❑ Natural Drainage/No Chang Other ❑ <br /> Drainage <br /> ExWng Roads <br /> Road/Street Name R.O.W. Width Pavement Width Curb/Gutter Sidewalks <br /> Yes❑ NPX Yes❑ Nom <br /> Yes❑ No❑ Yes❑ No❑ <br /> Yes❑ No❑ Yes❑ No❑ <br /> Exaafw <br /> vatjM Cactertstlos <br /> Excavation Area (Acres): ��.(� Fill Area (Acres): -� <br /> Existing Site Elevation (Average at 100' Intervals): <br /> Proposed Site Elevation (Average at 100' Intervals): <br /> Perimeter Elevation (Average at 100' Intervals, 5'from Property Line): 100• <br /> Perimeter Elevation (Average at 100' Intervals, 100'from Property Line): I Q0.3 <br /> Amount of Material to be Removed (Cubic Yards): 7 3 A G G• Y. <br /> Approximate Start Date: J^0-� S199Z Approximate End Date: Apr', 1 j91 <br /> Hours of Operation: 1 Average Daily Truck Trips: <br /> -3- <br /> i <br />