Laserfiche WebLink
MANAGEMENT APPROVAL <br /> In accordance with§112.5(b) <br /> This Spill Prevention Control and Countermeasures (SPCC) Plan is prepared in accordance with good <br /> engineering practices and has the full approval of management at the level with authority to commit the <br /> necessary resources. This SPCC Plan will be reviewed and evaluated at least once every 5 years, as <br /> required by the Code of Federal Regulations, 40CFR112.5(b). As required by 40CFR112.5(a), this SPCC <br /> Plan will be amended whenever there is a change in design, construction, operation, or maintenance which <br /> materially affects the facility's potential for discharge of petroleum products as described in 40CFR1 12.1(b). <br /> Lorraine Auerbach Date <br /> CEO <br /> Nick Chambers Date <br /> Operations and Maintenance Manager <br /> PLAN REVIEW <br /> In accordance with§112.5 <br /> This SPCC will be reviewed and evaluated at least once every five (5) years. See Appendix B, Table B-1 <br /> for 5 Year Review and Evaluation of SPCC Plan Log. <br /> If necessary, this SPCC Plan will be amended within six (6) months or renew, when there is a change in <br /> the facility design, construction, operation, or maintenance that materially affects the potential for a <br /> discharge to navigable waters or adjoining shorelines. Examples include adding or removing containers, <br /> reconstruction, replacement, or installation of piping systems, changes to secondary containment systems, <br /> changes in product stored at this facility, or revisions to standard operating procedures. See Appendix B, <br /> Table B-2 for Technical Amendment Log <br /> Draft P <br /> 06/12/2020 5:26:38 PM <br /> Dameron Hospital <br /> Spill Prevention Control and Countermeasure Plan <br /> June 12,2020 <br /> iv <br />