My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2800 - Aboveground Petroleum Storage Program
>
PR0526379
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 1:59:24 PM
Creation date
6/2/2020 3:00:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0526379
PE
2832
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANAGEMENT APPROVAL <br /> In accordance with§112.5(b) <br /> This Spill Prevention Control and Countermeasures (SPCC) Plan is prepared in accordance with good <br /> engineering practices and has the full approval of management at the level with authority to commit the <br /> necessary resources. This SPCC Plan will be reviewed and evaluated at least once every 5 years, as <br /> required by the Code of Federal Regulations, 40CFR112.5(b). As required by 40CFR112.5(a), this SPCC <br /> Plan will be amended whenever there is a change in design, construction, operation, or maintenance which <br /> materially affects the facility's potential for discharge of petroleum products as described in 40CFR1 12.1(b). <br /> Lorraine Auerbach Date <br /> CEO <br /> Nick Chambers Date <br /> Operations and Maintenance Manager <br /> PLAN REVIEW <br /> In accordance with§112.5 <br /> This SPCC will be reviewed and evaluated at least once every five (5) years. See Appendix B, Table B-1 <br /> for 5 Year Review and Evaluation of SPCC Plan Log. <br /> If necessary, this SPCC Plan will be amended within six (6) months or renew, when there is a change in <br /> the facility design, construction, operation, or maintenance that materially affects the potential for a <br /> discharge to navigable waters or adjoining shorelines. Examples include adding or removing containers, <br /> reconstruction, replacement, or installation of piping systems, changes to secondary containment systems, <br /> changes in product stored at this facility, or revisions to standard operating procedures. See Appendix B, <br /> Table B-2 for Technical Amendment Log <br /> Draft P <br /> 06/12/2020 5:26:38 PM <br /> Dameron Hospital <br /> Spill Prevention Control and Countermeasure Plan <br /> June 12,2020 <br /> iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.