Laserfiche WebLink
1 8 9 <br /> 3 � <br /> Q <br /> c� <br /> 2 4 z <br /> 0 <br /> 1 O <br /> 5 MAIN <br /> HOSPITAL <br /> BUILDING <br /> m <br /> 3 <br /> v <br /> c <br /> m <br /> a 6 <br /> 0 <br /> C <br /> 41 <br /> a` <br /> .n <br /> u1 <br /> Lo 7 <br /> C11 <br /> 0 <br /> a <br /> U <br /> U <br /> AREA B - MAIN HOSPITAL BUILDING <br /> a <br /> 1" = 50' <br /> r <br /> c <br /> N KEY NOTES <br /> E <br /> 0 1 EMERGENCY POWER GENERATOR 6 EXEMPT 6,000 UNDERGROUND STORAGE TANK <br /> O (NOT IN USE) O <br /> Y 275 GALLON DAY USE TANK CATCH BASIN WITH A BIO FILTER AND WITH <br /> O2 (NOT IN USE) O EMERGENCY SHUTOFF TO STORMWATER <br /> a SYSTEM. <br /> U 50 GALLON DAY USE TANK <br /> a O8 LOCATION OF SPILL CONTROL EQUIPMENT <br /> (NOT IN USE) O <br /> 100 GALLON DAY USE TANK GREASE TRAP TANK BEHIND <br /> OO (NOT IN USE) O LOCKED FENCE, COVERED <br /> 0 BY AWNING <br /> LOCKED BOILER ROOM WITHIN THE <br /> E <br /> O BASEMENT OF HOSPITAL <br /> T <br /> U) <br /> N <br /> T <br /> SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN <br /> T <br /> LL <br /> DATE 06/12/2020 ❑ ENGINEERING FIGURE: <br /> ■ ■ STRUCTURAL <br /> DESIGN - ENGINEERING <br /> ■ ARCHITECTURE A_ <br /> N DRAWN GR NESIEGFRIED ■ ARCHITECTURE <br /> ^` <br /> IT CTURE i•r <br /> ■ SURVEYING <br /> JOB NO. 19259 3 4 2 8 B r o o k s i d e R o a d, S t o c k ton C a l i f o r n i a 9 5 2 1 9 <br /> 209-943-2021 ww W.s i e g f r i e d e n g.c 0 m Fx: 209-942-0214 <br />