My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2800 - Aboveground Petroleum Storage Program
>
PR0526379
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 1:59:24 PM
Creation date
6/2/2020 3:00:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0526379
PE
2832
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for DAMERON HOSPITAL as of June02, 2020. <br /> Open violations from October 25, 2018 inspection <br /> Violation#302- Failed to review Plan once every five years and/or implement any resulting <br /> amendments. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan was last reviewed on March 31, 2011. A <br /> review and evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this <br /> review and evaluation, the SPCC Plan must be amended within 6 months of review, and recertified by a <br /> Professional Engineer if any technical amendments were made. Immediately conduct a review of the facility <br /> SPCC Plan and make any necessary amendments. <br /> ❑ This violation was corrected ❑ This violation will be corrected by(date) <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> Violation#601-Failure of Plan to fulfill basic requirements including a cross-referencing section. <br /> The Spill Prevention, Control, and Countermeasure(SPCC) Plan does not follow the order or requirements in <br /> 40 CFR Part 112, and a cross-reference was not provided. If you do not follow the sequence specified in 40 <br /> CFR 112 for the Plan, you must prepare an equivalent Plan and supplement it with a section <br /> cross-referencing the location of requirements in 40 CFR 112 and the equivalent Plan. Immediately amend <br /> the SPCC Plan to include a cross-reference or to follow the required sequence. <br /> ❑ This violation was corrected ❑ This violation will be corrected by(date) <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> Violation#603-Failed to adequately describe the physical layout of the facility in the Plan. <br /> The Underground Storage Tank(UST) is not marked as"exempt' on the facility diagram. The Spill <br /> Prevention, Control, and Countermeasure(SPCC) Plan shall include a facility diagram which must mark the <br /> location and contents of each fixed storage container and the storage area where mobile or portable <br /> containers are located. It must identify the location of and mark as"exempt' underground tanks. It must also <br /> include all transfer stations and connecting pipes, including intra-facility gathering lines. Immediately <br /> update the facility diagram to include all of the required information. Submit a legible copy of the updated <br /> facility diagram to the EHD for review. <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.