Laserfiche WebLink
MANAGEMENT APPROVAL <br /> In accordance with § 112. 5(b) <br /> This Spill Prevention Control and Countermeasures ( SPCC ) Plan is prepared in accordance with good <br /> engineering practices and has the full approval of management at the level with authority to commit the <br /> necessary resources . This SPCC Plan will be reviewed and evaluated at least once every 5 years , as <br /> required by the Code of Federal Regulations , 40CFRI 12 . 5 ( b) . As required by 40CFR112 . 5 (a) , this SPCC <br /> Plan will be amended whenever there is a change in design , construction , operation , or maintenance which <br /> materially affects the facility' s potential for discharge of petroleum products as described in 40CFR112 . 1 ( b ) . <br /> oaaglt Date <br /> GE9-- �Tr <br /> AOA1 / Al i !;1R0WVA% <br /> -1/9 <br /> Nick Chambers Date <br /> Operations and Maintenance Manager <br /> PLAN REVIEW <br /> In accordance with § 112. 5 <br /> This SPCC will be reviewed and evaluated at least once every five (5 ) years . See Appendix B , Table 13 - 1 <br /> for 5 Year Review and Evaluation of SPCC Plan Log . <br /> If necessary , this SPCC Plan will be amended within six (6) months or renew, when there is a change in <br /> the facility design , construction , operation , or maintenance that materially affects the potential for a <br /> discharge to navigable waters or adjoining shorelines . Examples include adding or removing containers , <br /> reconstruction , replacement , or installation of piping systems , changes to secondary containment systems , <br /> changes in product stored at this facility , or revisions to standard operating procedures . See Appendix B , <br /> Table B -2 for Technical Amendment Log <br /> Dameron Hospital <br /> Spill Prevention Control and Countermeasure Plan <br /> June 29, 2020 <br /> iv <br />