Laserfiche WebLink
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for DAMERON HOSPITAL as of June02, 2020. <br /> Open violations from October 25, 2018 inspection <br /> Violation#726- Plan failed to adequately describe overfill prevention methods for each container. <br /> Overfill prevention methods are not addressed in the SPCC plan for the 150 gallon day tanks, the 275 gallon <br /> day tank and the 100 gallon day tank. Engineer or update each container installation in accordance with <br /> good engineering practice to avoid discharges. You must provide at least one of the following devices. <br /> (i) High liquid level alarms with anaudible or visual signal at a constantly attended operation or surveillance <br /> station. In smaller facilities an audible air vent may suffice. <br /> (ii) High liquid level pump cutoff devices set to stop flow at a predetermined container content level. <br /> (iii) Direct audible or code signal communication between the container gauger and the pumping station. <br /> (iv)A fast response system for determining the liquid level of each bulk storage container such as digital <br /> computers, telepulse, or direct vision gauges. If you use this alternative, a person must be present to monitor <br /> gauges and the overall filling of bulk storage containers. <br /> (v)You must regularly test liquid level sensing devices to ensure proper operation <br /> ❑ This violation was corrected ❑ This violation will be corrected by(date) <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> Page 4 of 4 <br />