My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2800 - Aboveground Petroleum Storage Program
>
PR0526379
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 1:59:24 PM
Creation date
6/2/2020 3:00:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0526379
PE
2832
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of aboveground petroleum storage act violations <br /> that have not been addressed for DAMERON HOSPITAL as of June02, 2020. <br /> Open violations from October 25, 2018 inspection <br /> Violation#726- Plan failed to adequately describe overfill prevention methods for each container. <br /> Overfill prevention methods are not addressed in the SPCC plan for the 150 gallon day tanks, the 275 gallon <br /> day tank and the 100 gallon day tank. Engineer or update each container installation in accordance with <br /> good engineering practice to avoid discharges. You must provide at least one of the following devices. <br /> (i) High liquid level alarms with anaudible or visual signal at a constantly attended operation or surveillance <br /> station. In smaller facilities an audible air vent may suffice. <br /> (ii) High liquid level pump cutoff devices set to stop flow at a predetermined container content level. <br /> (iii) Direct audible or code signal communication between the container gauger and the pumping station. <br /> (iv)A fast response system for determining the liquid level of each bulk storage container such as digital <br /> computers, telepulse, or direct vision gauges. If you use this alternative, a person must be present to monitor <br /> gauges and the overall filling of bulk storage containers. <br /> (v)You must regularly test liquid level sensing devices to ensure proper operation <br /> ❑ This violation was corrected ❑ This violation will be corrected by(date) <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.