Laserfiche WebLink
1 8 9 <br /> Q <br /> c� <br /> 2 3 0 <br /> 1 0, <br /> 4 5 MAIN <br /> HOSPITAL <br /> BUILDING <br /> m <br /> 3 <br /> v <br /> c <br /> m <br /> a 6 <br /> 0 <br /> C <br /> 41 <br /> a` <br /> .n <br /> u1 <br /> Lo 7 <br /> Lo <br /> C11 <br /> 0 <br /> a <br /> U <br /> U <br /> AREA B - MAIN HOSPITAL BUILDING <br /> a <br /> 1" = 50' <br /> r <br /> c <br /> N KEY NOTES <br /> E <br /> o O1 EMERGENCY POWER GENERATOR O EXEMPT 6,000 UNDERGROUND <br /> STORAGE TANK <br /> Y CATCH BASIN WITH A BIO FILTER AND WITH <br /> O2 275 GALLON DAY USE TANK O7 EMERGENCY SHUTOFF TO STORMWATER <br /> a SYSTEM. <br /> U 100 GALLON DAY USE TANK <br /> a O (PERMANENTLY CLOSED) O LOCATION OF SPILL CONTROL EQUIPMENT <br /> GREASE TRAP TANK BEHIND <br /> OLOCKED BOILER ROOM WITHIN THE O LOCKED FENCE, COVERED <br /> = BASEMENT OF HOSPITAL BY AWNING <br /> 0 <br /> HAZARD ROOM LOCATION WITH <br /> E <br /> O 55-GALLON BARRELS <br /> T <br /> U) <br /> N <br /> T <br /> SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN <br /> T <br /> LL <br /> DATE 06/26/2020 ❑ ENGINEERING FIGURE: <br /> ■ ■ STRUCTURAL <br /> DESIGN - ENGINEERING <br /> ■ ARCHITECTURE A_ <br /> DRAWN GR NESIEGFRIED ■ ARCHITECTURE <br /> ^` <br /> IT CTURE i•r <br /> N ■ SURVEYING <br /> JOB NO. 19259 3 4 2 8 B r o o k s i d e R o a d, S t o c k ton C a l i f o r n i a 9 5 2 1 9 <br /> 209-943-2021 ww W.s i e g f r i e d e n g.c 0 m Fx: 209-942-0214 <br />